Laserfiche WebLink
• <br /> PUBLIC WORKS <br /> shoreline might be discouraging the optimal location of the pipe and <br /> access structures. If staying 200' back is due to permitting issues, would <br /> it be possible to partially construct the outfall line, and wait to hook it up <br /> to the outfalls when the trail is constructed? Or require Lot 5 to complete <br /> the line? <br /> 4. The comments below were generated from this project's Traffic Reviewer. If you have any <br /> questions regarding these comments, please contact Michael Brick with the City of Everett <br /> Public Works Department(425-257-7790 or MBrick@everettwa.gov). <br /> a. Show ramps on civil drawings. Locations as marked on landscape plans are acceptable, <br /> but C4 series sheets should also show them. <br /> b. Please see additional redlines for sidewalk alignment,pavement sections, and ramps. <br /> c. Note: The Port of Everett shall retain ownership of street lighting and signing per the <br /> General Transfer Agreement, Section 9. <br /> 5. Planning Review for this project is being conducted separately, by this project's Planner, John <br /> Jimerson. John will send a separate corrections letter, if required. If you have any questions <br /> regarding these comments, please contact John Jimerson with the City of Everett Planning <br /> Department(425-257-8737 or JJimerson@everettwa.gov). <br /> Page 4 of 4 <br /> s <br />