Laserfiche WebLink
Port of <br /> • <br /> EVERETT <br /> Memorandumrays4 <br /> W - e <br /> To: Sabrina Fandler Art 41911-4- <br /> , <br /> From: Elise Gronewald <br /> Date: June 5th, 2017 f/ R . <br /> Re: Plan Review Comments for Public Works Permit Application <br /> Proposal: Riverside Rd and 8th St Improvements (Port of Everett) Calg7rVrnl? <br /> Location: 505 E Marine View Dr <br /> Permit#: PW1703-047 <br /> The City of Everett Engineering/Permit Services sent comments on Permit submittal number <br /> PW1703-047 to the Port of Everett on 4/26/17. Please see the comments below and the Port's <br /> response as well as the attached redlines and revised drawing sets. <br /> 1. Please see the compiled list of comments below and the attached redlines to revise your <br /> plans accordingly, prior to resubmitting to the Permit Services Counter. If you have any <br /> questions regarding the comments/redlines or need anything further, please directly <br /> contact this project's Public Works plans reviewer, Sabrina Fandler, at 425-257-7813 or <br /> SFandler@everettwa.gov. <br /> a. Please resubmit the following items to the Permit Services Counter with your <br /> resubmittal once all requested revisions have been made: <br /> i. Transmittal Sheet: (1) available online at https://everettwa.gov/Permits or <br /> at the Permit Counter-2nd Floor, 3200 Cedar Street. <br /> ii. Plans: (4) sets of revised plans plus original City Markups. <br /> iii. Drainage Report: (2) copies of revised drainage report <br /> iv. Cost Estimate for Permit Fee Calculation Form: (1) copy of cost estimate <br /> form filled out for the City to use to calculate the Public Works Permit Fee. <br /> The Permit Counter is open Monday through Friday from 7:30am-12:OOpm and from <br /> 1:OOpm-4:00pm (closed between 12:OOpm-1:OOpm for lunch). <br /> b. Please see all redlines on the attached plans for required corrections. Frequently, <br /> redlines will be stand-alone and will not have an associated item in this corrections <br /> letter. <br /> i. See attached additional TESC notes to add to sheet C2.1. I can email these to <br /> you if you want to copy/paste them into CAD. <br /> PORT RESPONSE:Added to plans <br /> 2. Please incorporate any and all of the required changes to the stormwater pump system <br /> as directed by Rick Osborne, City of Everett TSG. Separate dialogue via phone and email t � <br /> 1 <br />