My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020/07/01 Council Agenda Packet
>
Council Agenda Packets
>
2020
>
2020/07/01 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 9:10:29 AM
Creation date
7/6/2020 9:09:24 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
7/1/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L <br /> r. <br /> 3200 Cedar Street, <br /> EVERETT Everett WA 98201 <br /> PUBLIC WORKS (425) 257-8800 <br /> BID SUMMARY <br /> Project Name: Maple Heights Bridge Seismic Retrofit <br /> W.O.# PW 3693 <br /> Date: 6/9/2020 <br /> For: Gael Fisk, Project Engineer <br /> Bidder Name: Bidder Totals: <br /> ENGINEER'S ESTIMATE $845,899.75 <br /> Combined Construction, Inc. $509,293.00 <br /> Interwest Construction, Inc. $678,910.00 <br /> Razz Construction, Inc. $708,611.00 <br /> C A Carey Corp $765,328.00 <br /> MJ Hughes Construction $816,975.40 <br /> Redtail, LLC $884,347.00 <br /> 28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.