My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015/06/03 Council Agenda Packet
>
Council Agenda Packets
>
2015
>
2015/06/03 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 10:52:19 AM
Creation date
7/6/2020 10:45:24 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
6/3/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
218
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9 . ;e , r Back-Up Claims : Deadline Date <br /> 0 <br /> • The ordinance directed the Public Works Department to <br /> establish a Deadline Date for backwater valve installation <br /> Before or <br /> After for all Designated Connections. <br /> Deadline <br /> Date? <br /> • Notice of the Deadline Date was mailed to all Designated <br /> Connections on September 12, 2014. The Deadline Date <br /> currently is June 1, 2015 for all Designated Connections. <br /> • The ordinance requires rejection of any sewer back-up <br /> claim from a storm event after the Deadline Date for a <br /> Designated Connection that did not have a backwater <br /> valve installed. <br /> • Sewer back-up claims from Designated Connections for <br /> 17 2 storm events before the Deadline Date go to the claims <br /> 1 <br /> process. <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.