Laserfiche WebLink
Change Order Cover SheetlFor Internal City Use Only <br /> 1J <br /> CONTRACT TIME <br /> Original Contract Duration Working Days Calendar Days Fl 230 <br /> Date of Notice to Proceed 12/10/2014 <br /> Cumulative adjustment to duration by prior Change Orders 270 <br /> Adjustment to duration by this Change Order 7 <br /> New Contract Duration (including this Change Order) 277 <br /> EXPLANATION/JUSTIFICATION <br /> Change Order 3 work items <br /> 1) Modification to the storm drain and water systems. <br /> 2) From the time period March 31, 2015 to May 7, 2015 labor, trucking and offsite disposal to remove construction debris <br /> encountered during excavation activity. The construction debris includes but is not limited to: concrete, brick, timbers, <br /> large woody debris, and various metals. <br /> 3) Cleanup of contaminated soil encountered during installation of utilities. <br /> 4) Building structural modifications, review and additional concrete. <br /> • <br /> CityStaff Contact: Bob Hillmann <br /> Date: 06/02/2015 <br /> S:A Ccm To-i\CT 3V?3 Jcke_.- s_ 1V oj, :,ACb - s\RFCO? — MCO 3\CO 3 00 '53 33 C 0rc:ae Te_tereel Cover _t._oc <br />