ATTACHMENT A <br /> Project Name Senator Henry Jackson Park Renovation Phase I <br /> Account ( JC #) PO PW2014-43 <br /> Contractor: Faber.Construction <br /> Change Order No. 3 <br /> Date: 06/02/2015 <br /> Item Description Change Prop Character Quantit Unit Unit Price Total <br /> /Change Dir of CO y_ <br /> 1 Public Works rain garden and Change PI — UDC 1 LS $146,911.44 <br /> stormwater upgrades added to Prop - UCC <br /> scope of work. Parks — various <br /> design changes and unsuitable <br /> material disposal. <br /> 2 Unsuitable material disposal and Change UCC 1 LS $36,901.68 <br /> environmental work. Prop <br /> 3 Unsuitable material disposal, Change UCC — PI 1 LS $91,150.36 <br /> environmental work, storm water Prop - UDC <br /> ►� system and water supply <br /> upgrades and building <br /> modificaitons. <br /> 4 1 LS 0 <br /> Total Change Order #1-2 $274,963.48 <br /> Notes: <br /> 1. Credits to the City are shown as "( )" <br /> 2. The City Field Staff, based on site conditions and immediate construction requirements, direct Field Changes <br /> 3. Change Proposals initiated by the Contractor; Change Directives initiated by the City. <br /> 4. Character of Change Order <br /> a. PI-Project Improvement <br /> b. UDC-Unforeseen Design Conditions <br /> c. UCC- Unforeseen Construction Conditions <br /> S:\#Common\C1P3\43 Jackson Phase 1\ProjMan\ChangeOrders\RFCOP-CO\CO 3\CO 3 Change Order ATTACHMENT A Form.doc <br />