Laserfiche WebLink
41 <br /> I I <br /> . \ <br /> 1. <br /> I 4' CONTRACTOR TO MAINTAIN 0 II .__d <br /> I SERVICES TO Q-DOCK, R-DOCK, <br /> ITiISEINE PIER, SEGMENT C AND w ;� _ w w w w 'I <br /> / SEGMENT D THROUGH CONSTRUCTION ;I <br /> 1 1� CONTRACTOR TO COORDINATE WITH / '� <br /> EXISTING DEMOLITION OF EXISTING LINE AND <br /> 1c RESTROOM CONSTRUCTION OF NEW WATERLINE a* $ 1 <br /> BUILDING AS SHOWN ON M1.03 1 <br /> 1 /1 LiII <br /> ' 1W! <br /> � <br /> y W- 1 <br /> it i <br /> f 1 1 <br /> CENTRAL ' 1 EXISTING ' <br /> MARINA EXISTING 'I SHUT-OFF1 ji <br /> SEGMENT C ' y 3 VALVE <br /> BULKHEAD 1 <br /> j3 <br /> t 1 - I I <br /> 1 1 8"0 HDPE <br /> 4 I SUPPLY LINE <br /> EXISTING 6"0 EAST 4 �I 3 <br /> SPRINKLER SUPPLY N 1 I <br /> I` <br /> LINE DEMOLISHED 1 TEMPORARILY REROUTE 1 3 <br /> I 11_41 PIPES TO MAINTAIN SERVICE <br /> RELOCATED t 1 DURING CONSTRUCTION. <br /> GANGWAY TO 1 EXISTING 6"0 EAST SPRINKLER : 6 <br /> SUPPLY LINE TO BE DEMOLISHED 1 I I <br /> 0-FLOAT ' 1 i 3 • K, <br /> 1 1 EXISTING EAST SPRINKLERSw73 <br /> 4 41' TO BE DEMOLISHED DURING m 3 <br /> o NEW 2"0 FLEX HOSE I SEGMENT D DEMOLITION m <br /> o TO SERVICE 0-FLOAT <br /> 70 <br /> ._... ...._W... � <br /> W . <br /> I ul ( lJ1J ! 1 ! H1 , HHHL1 , , J . H1L1LHHHl <br /> t <br /> 3 <br /> cc <br /> EXISTING J 0_ 1* 11 I IIIIIII IlI 1 I I11± Wa � <br /> re SEINE PIER 1I I I I I I I I I cr I "\ � J <br /> o " . w _ <br /> 1 <br /> w w EXISTING R-FLOAT n <br /> •, , <br /> N EXISTING ENCLOSURE i 3 <br /> z 6"0 EXISTING WITH BACKFLOW PREVENTOR I <br /> P WEST SPRINKLER TO SEGMENT C AND 0-FLOAT EXISTING <br /> EE SEGMENT D <br /> NEW 2"0 FLEX HOSE WHARF <br /> O TO SERVICE R-FLOAT w i <br /> z 3 <br /> a <br /> EXISTING ENCLOSURE WITH <br /> m SPRINKLER DRY VALVE TO 3 ' 0 <br /> cc REMAIN DURING PIER <br /> o ACCESS CONSTRUCTION <br /> W EXISTING <br /> N SOUTH SEGMENT E I <br /> .. MARINA WHARF 3 <br /> L... NOTES: <br /> i 1. INTERIM UTILITY SYSTEM IS TO OCCUR DURING GUEST <br /> DOCK 5 APPROACH PIER CONSTRUCTION. THE INTERIM 1 <br /> PLAN IS TO OCCUR DURING THE DEMOLITION OF A <br /> N PORTION OF EXISTING SEGMENT D AND THE 1 ! ; <br /> RELOCATION OF GANGWAY TO 0-FLOAT PER I 4 <br /> i' SUGGESTED SEQUENCE 1 AND 2 ON SHEET D1.03. <br /> 2. EXISTING ENCLOSURE WITH BACKFLOW PREVENTOR TO ;I 1 I 3 <br /> R-FLOAT LOCATED ON SEGMENT D TO BE REMOVED <br /> o AND RETURNED TO THE PORT. <br /> O PLAN ' <br /> kSCALE IN FEET <br /> IF THIS DRAWING IS NOT I-- 7 <br /> 22"x34" SCALE ACCORDINGLY. 20 0 20 40 <br /> 0 _ <br /> I- PROJECT ENGINEER: SCALE: DWG. <br /> 0 PND INCORPORATED IS NOT RESPONSIBLE FOR SAFETY . BELSICK NOTED <br /> PORT OF EVER ETT M1.02 <br /> a. Port O PROGRAMS.METHODS OR SIGN SURES OF THESE DRAION,OR THE <br /> ��a ERT sa SEINER WHARF SEGMENT D & <br /> CONSTRUCTION OF THE DESIGN SHOWN ON THESE DRAWINGS. a` T"+.;� DESIGNED BY: DATE: <br /> `1 1736 Fourth Avenue S.,Swire,1 WHERE SPECIFICATIONS ARE GENERAL OR NOT CALLED OUT, I 4 '�. Ir C. MCNABB JUNE 13, 2016 CIP 140. 2-0-023-01 <br /> SnNe,Wash YRI34 THE SPECIFICATIONS SHALL CONFORM TO STANDARDS OF PACIFIC RIM PLAZA PLATFORM 2-0-044-01, 6-8-001-09 <br /> J �4�• © © © mY,tun jq DRAWN BY: CHECKED BY: <br /> N EvERETr p:206.(.21.1387 INDUSTRY. DRAWINGS ARE FOR USE ON THIS PROJECT ONLY <br /> 7 CCN• I,N(.TNI.LRS,INC. .vw.pn4 A..cum AND ARE NOT INTENDED FOR REUSE WITHOUT WRITTEN ;" o�isrs&�o`2� G. DEAN G. WATTERS PROJECTRMR—CM-2016-06 <br /> E, P.O. BOX 538 � IN ANY VMANNEAL R THAT WOULD CONSTITUTE M PND. DRAWINGS ARE ALSO <br /> DETRIMENT NOT TO USED �SS/ONAI% APPROVED BY: INTERIM FIRE SPRINKLER <br /> A\06 13 16 GW ISSUED FOR BID AND CONSTRUCTION <br /> CV EVERE TT, WA 98206 DIRECTLY OR INDIRECTLY TO PND. T� <br /> (425) 259-3164 Na DATE BY REVISION G/13//6 SYSTEM PLAN SHEET NO. 51 OF 71 <br />