Laserfiche WebLink
741 Marine Drive PHONE <br /> Bellingham,WA 98225 360733_7318 <br /> "iv <br /> T .�is 20611 , Avenue NE ;oto 3__ FAX <br /> eis <br /> Arlington,WA 98223 888 251 5276 360 733_7418 <br /> December 9, 2016 <br /> Job No. 16-0659 <br /> Rainier Building Corporation <br /> P.O. Box 1947 <br /> Everett,Washington 98206 <br /> Attn.: Mr. Chris Dugovich <br /> Re: Geotechnical Engineering Services. <br /> Proposed Residential Development <br /> 3313 Oakes Avenue <br /> Everett,Washington <br /> Dear Mr. Dugovich: <br /> As requested, GeoTest Services, Inc. (GTS) is pleased to submit this report <br /> summarizing the results of our geotechnical engineering evaluation for the proposed <br /> residential development to be constructed at 3313 Oakes Avenue in Everett, <br /> Washington, as shown on the Vicinity Map, Figure 1. The purpose of our services was <br /> to evaluate general subsurface conditions beneath the site from which conclusions and <br /> recommendations for general site development and foundation design could be <br /> formulated. Specifically, our scope of services included the following tasks: <br /> • Exploration of soil and groundwater conditions underlying the site by drilling three <br /> test borings with a track-mounted drill rig to evaluate subsurface conditions. <br /> • Laboratory testing on representative samples in order to classify and evaluate <br /> the engineering characteristics of the encountered soils. <br /> • Provide this written report containing a description of subsurface conditions, <br /> boring logs, findings and recommendations pertaining to site preparation and <br /> earthwork, fill and compaction, wet weather earthwork, seismic design, <br /> foundation recommendations, concrete slab-on-grade construction, foundation <br /> and site drainage, utilities, temporary and permanent slopes, temporary shoring, <br /> geotechnical consultation and construction monitoring, and lateral earth <br /> pressures for retaining wall design. <br /> PROJECT DESCRIPTION <br /> For this report, we were provided with preliminary architectural drawings of the proposed <br /> three-unit residential development. Carl J. Colson (Architect) prepared these plans, <br /> which were dated November 21, 2016. The architect also provided us with another <br /> drawing showing topographic information, which was undated. Based on these <br /> drawings and conversations with Mr. Colson, we understand that the new residential <br /> development would consist of two buildings. <br /> Page 1 of 17 <br />