Laserfiche WebLink
10/18/2019 Page <br /> City of Everett <br /> 10:47:31AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. B 1702-009 Site Address 3313 OAKES AVE UNIT A&B <br /> Applied 2/7/2017 Applicant DUGOVICH CHRIS Lot <br /> Approved 7/25/2017 Owner RAINIER BUILDING CORPORATION Block <br /> Issued 7/27/2017 Contractor WHITETAIL CONSTRUCTION Tract <br /> Parent Permit No. PW1702-005 Description NEW DUPLEX <br /> Notes LANDSCAPE INSPECTION REQ'D PRIOR TO FINAL INSPECTION.CONTACT KELSEY HEYD @ <br /> 425-257-7275 TO SCHEDULE AN INSPECTION.SEPARATE PLUMBING&MECHANICAL <br /> PERMITS REQ'D. <br /> Scheduled Completed Tvpe Inspector Result Remarks Inspector's Comments <br /> 8/25/2017 8/25/2017 UFER Ground DWF Approval As noted UFERS installed two locations-contractor <br /> verified setbacks. <br /> 8/25/2017 8/25/2017 Footing DWF Approval As noted UFERS installed two locations-contractor <br /> verified setbacks. <br /> 9/5/2017 9/5/2017 Foundation DWF PartialApproval As noted Correction:Approved as noted. <br /> 2"toe required minimum as per IRC. <br /> Then OK for concrete. <br /> 9/12/2017 9/12/2017 Footing DWF Other Unable to inspect, <br /> footing drains <br /> 9/13/2017 9/13/2017 Footing DWF Other Unable to inspect, <br /> PW footing drains <br /> 11/30/2017 11/30/2017 BLDG EXTERIOR DWF PARTIAL APPR Contractor to complete install of STHD14 <br /> SHEAR or approved equal strap,then OK to cover. <br /> 2/27/2018 2/27/2018 BLDG DWF CORRECTION Not ready,need <br /> 08-FRAMING Mechanical permit <br /> 3/1/2018 3/1/2018 BLDG DWF CORRECTION Not ready <br /> 08-FRAMING <br /> 3/5/2018 3/5/2018 BLDG DWF PARTIAL APPR OK to insulate. <br /> 08-FRAMING Need to install seismic straps on cut-outs <br /> over 50%top plates. <br /> 3/12/2018 3/12/2018 BLDG DWF CORRECTION Unit A-Main floor-insulate corner wall <br /> 11-INSULATION (gap open) <br /> Unit B-strap cut outs over 50%top plate <br /> southwall(party wall)main floor <br /> Note:Need to fire tape attic wall before <br /> installing ceilign upstairs(Unit A) <br /> 3/13/2018 3/13/2018 BLDG DWF PARTIAL APPR Duplex B units insulation OK to cover <br /> 11-INSULATION (drywall) <br /> And partial approval cover on A unit <br /> Accept for attic*need to inspect fire wall <br /> 3/13/2018 3/13/2018 BLDG DWF PARTIAL APPR Duplex B units insulation OK to cover <br /> 09-DRYWALL (drywall) <br /> And partial approval cover on A unit <br /> Accept for attic*need to inspect fire wall <br /> 3/14/2018 3/14/2018 BLDG DWF PARTIAL APPR Unit A -OK to <br /> 09-DRYWALL cover <br /> 3/28/2018 3/28/2018 BLDG DWF APPROVAL <br /> 09-DRYWALL <br /> 5/10/2018 5/10/2018 BLDG KMK CORRECTION 1.Add anchor bolts at end of bottom plates <br /> 08-FRAMING at covered patio door and entry. <br /> 2.Insulate behind tub/shower. <br /> OK to insulate. <br /> 9/11/2018 9/11/2018 BLDG 14-FINAL KMK CORRECTION Not ready.Need <br /> mechanical final. <br /> 9/12/2018 9/12/2018 BLDG 14-FINAL DWF CORRECTION -Need to fill holes ceiling of garage(fire <br /> separation). <br /> -Adjust bomber hinges man-door both A <br /> and B units. <br /> -Need blower door test results insulation <br /> certificate letter(copy). <br /> 9/17/2018 9/17/2018 BLDG 14-FINAL DWF CORRECTION Not ready 11:08am <br /> INSP12 CRWsYSTEMS <br />