My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2219 PINEHURST AVE BASE FILE 2020-07-14
>
Address Records
>
PINEHURST AVE
>
2219
>
BASE FILE
>
2219 PINEHURST AVE BASE FILE 2020-07-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2020 4:05:40 PM
Creation date
7/14/2020 4:03:31 PM
Metadata
Fields
Template:
Address Document
Street Name
PINEHURST AVE
Street Number
2219
Tenant Name
BASE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
is <br /> PREPARATION OF STORMWATER SITE PLANS <br /> The project is subject to the provisions of the 2014 Department of Ecology Stormwater Drainage Manual. <br /> This report, along with the accompanying plans, is intended to satisfy the drainage manual's site plan <br /> preparation requirements. The DOE Drainage Manual outlines a number of minimum requirements which <br /> must be addressed as part of the design. The minimum requirements for"new development" projects are <br /> determined from Volume I, Figure 1.1 of the City of Everett drainage manual, as follows: <br /> Yes <br /> Is project exempt from all MR's per No requirements of <br /> DOE volume 1? DOE volume 'Apply <br /> I <br /> No <br /> Yes ' 1 <br /> Is project exempt from all MR's except > MR 2 applies to the project <br /> MR 2 per DOE volume I <br /> t <br /> No <br /> Does the existing site have 35%or more existing Yes <br /> impervious surface OR Go to Redevelopment flow <br /> does the project otherwise meet the definition of chart in Figure 1.2 <br /> redevelopment in DOE volume 1? <br /> No <br /> Does the project result in or add 2,000 square feet or No <br /> more of new plus replaced hard surface, OR MR 2 applies to the project. <br /> Include 7,000 square feet or more of land disturbing <br /> activity? > > <br /> Yes <br /> Does the project result in or add 5,000 square feet <br /> or more of new plus replaced hard surface, OR <br /> convert%acres or more of vegetation to lawn or Yes MR's 1 —5 apply to new and <br /> landscaped areas, OR replaced hard surface and <br /> convert 2.5 acres or more of native vegetation to all disturbed land. <br /> pasture? <br /> No <br /> v <br /> 1 <br /> MR's 1 —9 apply to new and replaced hard <br /> surface and converted vegetation areas. <br /> J <br /> The manual also requires completion of the following four tasks as part of the site plan preparation <br /> process: <br /> Pinehurst Ave. Duplex <br /> Drainage Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.