Laserfiche WebLink
8/12/2019 (Page 1 <br /> City of Everett <br /> 11:09:51AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. C1712-005 Site Address 7109 RAINIER DR C&D <br /> Applied 12/8/2017 Applicant REYKDAL GORDON P Lot <br /> Approved 3/15/2018 Owner REYKDAL GORDON P Block <br /> Issued 3/15/2018 Contractor AERO CONSTRUCTION Tract <br /> Parent Permit No. PW 1709-032 Description NEW DUPLEX-BUILDING 2 C&D-REYKDAL CONDOS <br /> Notes PLANNING INSPECTION REQUIRED PRIOR TO FINAL <br /> CALL KELSEY HEYD 425-257-7275 TO SCHEDULE <br /> Scheduled Comnleted Tyne Insnector Result Remarks Insuector's Comments <br /> 3/14/2018 3/14/2018 BLDG KMK APPROVAL Maintain set backs <br /> 02-FOOTING/SETB per plan <br /> 3/14/2018 3/14/2018 BLDG 04-UFER KMK APPROVAL Maintain set backs <br /> GROUND per plan <br /> 4/11/2018 4/11/2018 SPECIAL KMK APPROVAL Foundation <br /> INSPECTION <br /> 5/4/2018 5/4/2018 PLUMB DXW APPROVAL <br /> 02-GROUND <br /> 5/8/2018 5/8/2018 BLDG DWF APPROVAL OK to cover <br /> 06-UNDERSLAB <br /> 8/14/2018 8/14/2018 ELEC 01-GROUND MCB APPROVAL No electrical permit.OK conduits to vault. <br /> WORK <br /> 9/25/2018 9/25/2018 BLDG DWF PARTIAL APPR Party wall 1st floor OK to cover for fire <br /> 10-INTERIOR protection. <br /> Subject to complete nailing panel on floor- <br /> 26"from south end,then OK to cover. <br /> 9/26/2018 9/26/2018 BLDG DWF CORRECTION Not ready <br /> 10-INTERIOR <br /> 9/26/2018 9/26/2018 BLDG DWF CORRECTION Not ready <br /> 09-DRYWALL <br /> 9/27/2018 9/27/2018 BLDG DWF PARTIAL APPR 1st floor party wall <br /> 10-INTERIOR Interior shear <br /> Fire protection party walls <br /> OK to stand panel <br /> 9/27/2018 9/27/2018 BLDG DWF PARTIAL APPR 1st floor party wall <br /> 09-DRYWALL Interior shear <br /> Fire protection party walls <br /> OK to stand panel <br /> 10/4/2018 10/4/2018 BLDG DWF PARTIAL APPR 2nd floor party wall <br /> 10-INTERIOR OK to cover <br /> 10/5/2018 10/5/2018 BLDG DWF PARTIAL APPR Party wall fire protection OK to flip walls <br /> 09-DRYWALL <br /> 10/15/2018 10/15/2018 BLDG DWF PARTIAL APPR 3rd floor OK interior <br /> 10-INTERIOR party wall-shear nailing <br /> Return in pm 1:55 <br /> For drywall(party wall)fire protection <br /> 5/8"densglas <br /> OK to tilt up wall. <br /> 10/15/2018 10/15/2018 BLDG DWF PARTIAL APPR 3rd floor OK interior <br /> 09-DRYWALL party wall-shear nailing <br /> Return in pm 1:55 <br /> For drywall(party wall)fire protection <br /> 5/8"densglas <br /> OK to tilt up wall. <br /> 10/22/2018 10/22/2018 BLDG DWF PARTIAL APPR Attic gable <br /> 09-DRYWALL Fire protection <br /> Note:need to fire tape seams and nail <br /> heads. <br /> Will inspect on building final. <br /> 10/25/2018 10/25/2018 BLDG DWF CORRECTION LTP4 @5"on center(west end of unit C as <br /> 07-EXTERIOR per plans <br /> 11/27/2018 11/27/2018 BLDG DWF APPROVAL <br /> 07-EXTERIOR <br /> INSP12 c SYS TEM°S <br />