My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7109 RAINIER DR C D 2022-04-05
>
Address Records
>
RAINIER DR
>
7109
>
7109 RAINIER DR C D 2022-04-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2022 3:22:24 PM
Creation date
7/15/2020 8:06:40 AM
Metadata
Fields
Template:
Address Document
Street Name
RAINIER DR
Street Number
7109
Unit
C D
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8/12/2019 Page 2 <br /> 11:09:51AM City of Everett <br /> INSPECTION ACTIVITY REPORT <br /> 11/30/2018 11/30/2018 BLDG DWF PARTIAL APPR Patio decks framing <br /> 08-FRAMING only OK to cover <br /> 1/10/2019 1/10/2019 PLUMB DXW APPROVAL as noted Phone:425-750-1146 <br /> 03-ROUGH IN <br /> (1/10/2019 11:44 AM DXW) <br /> at final hot water tank relief line to go to <br /> outside on east end of bldg with gravity <br /> grade. <br /> 3/6/2019 3/6/2019 MECH 04-ROUGH DXW APPROVAL as noted F/P exh to Phone:425-750-1146 <br /> IN be to mfg spec. <br /> 3/6/2019 3/6/2019 GAS 01-ROUGH IN DXW APPROVAL Phone:425-750-1146 <br /> 3/8/2019 3/8/2019 BLDG DWF APPROVAL as noted Mark 425-750-1146 <br /> 08-FRAMING <br /> (3/8/2019 2:30 PM DWF) <br /> Contractor to install A35's to stair stringer <br /> as discussed. <br /> Then ok to insulate. <br /> 3/13/2019 3/13/2019 BLDG DWF APPROVAL as noted (3/13/2019 10:42 AM DWF) <br /> 11-INSULATION Contractor to provide a copy of insulation <br /> certificate and blower door test at building <br /> final. <br /> 3/19/2019 3/19/2019 BLDG DWF PARTIAL APPR Drywall in garage only,ok to cover <br /> 09-DRYWALL <br /> 3/20/2019 3/20/2019 BLDG DWF APPROVAL <br /> 09-DRYWALL <br /> 3/28/2019 3/28/2019 BLDG DWF PARTIAL APPR Received letter for Shear wall inspection <br /> 08-FRAMING from Arch/ Eng. <br /> 6/12/2019 6/12/2019 GAS 03-FINAL DXW APPROVAL <br /> 6/12/2019 6/12/2019 PLUMB 06-FINAL DXW APPROVAL <br /> 6/12/2019 6/12/2019 MECH 06-FINAL DXW APPROVAL 425-750-1146 Mark Reykdal <br /> 6/21/2019 6/21/2019 BLDG 15-FINAL DWF APPROVAL Subject to Need Public Works PW1709-0332 sign off <br /> PW 1709-0332, before end of site project.And Planning <br /> Planning,Fire Dept. <br /> Also Fire Dept needs to sign off on site. <br /> 8/8/2019 8/8/2019 PLANNING FINAL KLH APPROVAL <br /> 8/8/2019 8/8/2019 10:4: BLDG 17-FIRE SAG APPROVAL (8/8/2019 10:57 AM SAG) <br /> FINAL FOR Owner to remove new tree next to hydrant <br /> 8/9/2019 8/9/2019 ADMIN USE TKJ APPROVAL <br /> ONLY** <br /> 8/9/2019 8/9/2019 CERTIFICATE OF TKJ APPRVD-PERK <br /> OCCUPANCY <br /> 8/9/2019 8/9/2019 BLDG 15-FINAL TKJ APPROVAL PW,PLNG,FIRE Mark 425-750-1146 <br /> FINALS APPRVD <br /> INSP12 CRWSY: TS <br />
The URL can be used to link to this page
Your browser does not support the video tag.