My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7109 RAINIER DR E F 2020-07-15
>
Address Records
>
RAINIER DR
>
7109
>
7109 RAINIER DR E F 2020-07-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2020 8:36:43 AM
Creation date
7/15/2020 8:35:24 AM
Metadata
Fields
Template:
Address Document
Street Name
RAINIER DR
Street Number
7109
Unit
E F
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8/12/2019 City of Everett (Page 1 <br /> 11:08:46AM /' <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. C1712-006 Site Address 7109 RAINIER DRE&F <br /> Applied 12/8/2017 Applicant REYKDAL GORDON P Lot <br /> Approved 3/15/2018 Owner REYKDAL GORDON P Block <br /> Issued 3/15/2018 Contractor AERO CONSTRUCTION Tract <br /> Parent Permit No. PW 1709-032 Description NEW DUPLEX-BUILDING 3 E&F-REYKDAL CONDOS <br /> Notes PLANNING INSPECTION REQUIRED PRIOR TO FINAL <br /> CALL KELSEY HEYD 425-257-7275 TO SCHEDULE <br /> Scheduled Completed Tyne Inspector Result Remarks Inspector's Comments <br /> 4/11/2018 4/11/2018 SPECIAL KMK APPROVAL Foundation <br /> INSPECTION <br /> 5/4/2018 5/4/2018 PLUMB DXW APPROVAL <br /> 02-GROUND <br /> 5/8/2018 5/8/2018 BLDG DWF APPROVAL OK for concrete <br /> 06-UNDERSLAB <br /> 6/15/2018 6/15/2018 BLDG DWF PARTIAL APPR Party wall garage-SW-D <br /> 10-INTERIOR Ok to cover shear wall <br /> 6/18/2018 6/18/2018 BLDG DWF CORRECTION Drywall fire <br /> 09-DRYWALL protection not ready. <br /> 6/25/2018 6/25/2018 BLDG DWF PARTIAL APPR Party wall 1st floor 5/8"dens glass <br /> 09-DRYWALL fire protection <br /> OK to install walls <br /> 6/27/2018 6/27/2018 BLDG DWF PARTIAL APPR 2nd floor OK to <br /> 10-INTERIOR install drywall <br /> 6/27/2018 6/27/2018 BLDG DWF PARTIAL APPR <br /> 09-DRYWALL <br /> 6/28/2018 6/28/2018 BLDG DWF PARTIAL APPR 2nd floor party wall fire protection <br /> 09-DRYWALL OK to install <br /> 7/6/2018 7/6/2018 BLDG DWF PARTIAL APPR 3rd floor party wall shear nailing OK to <br /> 10-INTERIOR cover with drywall(5/8"dens glass). <br /> 7/9/2018 7/9/2018 BLDG DWF PARTIAL APPR 3rd floor-Party wall/fire protection interior <br /> 10-INTERIOR only <br /> Shearwall and gables OK to cover <br /> Drywall-5/8"dens glass <br /> OK to cover(tilt up walls) <br /> Note:complete dry wall at tip of gable <br /> 4" <br /> 7/9/2018 7/9/2018 BLDG DWF PARTIAL APPR 3rd floor-Party wall/fire protection interior <br /> 09-DRYWALL only <br /> Shearwall and gables OK to cover <br /> Drywall-5/8"dens glass <br /> OK to cover(tilt up walls) <br /> Note:complete dry wall at tip of gable <br /> 4" <br /> 7/25/2018 7/25/2018 BLDG DWF PARTIAL APPR OK to install siding <br /> 07-EXTERIOR Garage fron I-beams/columns not <br /> completed at this time.Arch/engineering to <br /> inspect-letter. <br /> 8/2/2018 8/2/2018 PLUMB DXW APPROVAL As noted Add nail plates as needed and insulate <br /> 03-ROUGH IN water lines. <br /> 8/2/2018 8/2/2018 BLDG DWF PARTIAL APPR Insulation-walls(shear-double wall) <br /> 11-INSULATION Only-East and west ends <br /> OK to cover with siding <br /> 8/24/2018 8/24/2018 BLDG DWF PARTIAL APPR OK to cover <br /> 07-EXTERIOR <br /> 9/19/2018 9/19/2018 GAS 01-ROUGH IN DXW CORRECTION Unit F gas pipe 28psi OK rough in <br /> Retest unit E,check for leaks. <br /> INSP12 SY TE S <br />
The URL can be used to link to this page
Your browser does not support the video tag.