Laserfiche WebLink
8/12/2019 Page 2 <br /> City of Everett <br /> 11:08:46AM <br /> INSPECTION ACTIVITY REPORT <br /> 9/26/2018 9/26/2018 PLUMB DXW APPROVAL As noted Rough in gas pipe unit E 22psi. <br /> 03-ROUGH IN Mechanical rough in ok E and F. <br /> Duct test required t final. <br /> As noted:Will look at hot water tank <br /> exhaust at final.Install!hot water tank to <br /> MFG spec.Need spec for insulation. <br /> Complete proper radius on flex for exhaust. <br /> 9/26/2018 9/26/2018 GAS 01-ROUGH IN DXW APPROVAL As noted Rough in gas pipe unit E 22psi. <br /> Mechanical rough in ok E and F. <br /> Duct test required t final. <br /> As noted:Will look at hot water tank <br /> exhaust at final.Install!hot water tank to <br /> MFG spec.Need spec for insulation. <br /> Complete proper radius on flex for exhaust. <br /> 9/27/2018 9/27/2018 BLDG DWF CORRECTION Complete air seal <br /> 08-FRAMING stairway stringers <br /> plates(garage) <br /> Complete anchor bolts(nuts/washers) <br /> Need positive connection <br /> Post/beam 6x10"deck beam <br /> OK to insulate-will inspect above <br /> correction on insulation insapection. <br /> 10/1/2018 10/1/2018 BLDG DWF APPROVAL As noted Provide blower door test <br /> 08-FRAMING Complete air seal in stairway(plates) <br /> Complete attic gable <br /> Fire taping <br /> Mud screw heads <br /> Both units <br /> 10/1/2018 10/1/2018 BLDG DWF APPROVAL As noted Provide blower door test <br /> 11-INSULATION Complete air seal in stairway(plates) <br /> Complete attic gable <br /> Fire taping <br /> Mud screw heads <br /> Both units <br /> 10/8/2018 10/8/2018 BLDG DWF APPROVAL OK to cover <br /> 09-DRYWALL <br /> 11/13/2018 11/13/2018 BLDG DWF APPROVAL As noted Subject to install of DTT22 per plans. <br /> 08-FRAMING Or per arch/eng approval. <br /> 11/30/2018 11/30/2018 BLDG DWF PARTIAL APPR Patio deck framing <br /> 08-FRAMING only OK to cover <br /> 6/21/2019 6/21/2019 PLUMB 06-FINAL DXW APPROVAL <br /> 6/21/2019 6/21/2019 GAS 03-FINAL DXW APPROVAL <br /> 6/21/2019 6/21/2019 MECH 06-FINAL DXW APPROVAL <br /> 6/24/2019 6/24/2019 BLDG 15-FINAL DWF CORRECTION Unit F needs to have safety glass installed <br /> near stairway,top floor. <br /> Note: Need Fire Dept,Public Works and <br /> Planing Dept finals for site. <br /> 6/28/2019 6/28/2019 BLDG 15-FINAL DWF PARTIAL APPR 425-750-1146 Mark <br /> (6/28/2019 11:51 AM DWF) <br /> Need Public Works and Fire Dept Finals for <br /> site. <br /> 8/8/2019 8/8/2019 PLANNING FINAL KLH APPROVAL <br /> 8/8/2019 8/8/2019 BLDG 17-FIRE SAG APPROVAL <br /> FINAL FOR <br /> 8/9/2019 8/9/2019 ADMIN USE TKJ APPROVAL <br /> ONLY** <br /> 8/9/2019 8/9/2019 BLDG 15-FINAL TKJ APPRVD-PERK PW,PLNG,FIRE <br /> FINALS APPRVD <br /> 8/9/2019 8/9/2019 CERTIFICATE OF TKJ APPROVAL <br /> OCCUPANCY <br /> INSP12 CRWs YS TEM S <br />