Laserfiche WebLink
To: Mark Reykdal <br /> From: Doug Engelson <br /> Date: 11-20-18 <br /> RE: 1380-2 at Rainier Avenue, Permit #s C1712-004 Units A&B <br /> C1712-005 Units C&D <br /> C1712-006 Units E&F <br /> C1712-007 Units G&H <br /> In lieu of spaced "Trex" decking with "Trex Rain Escape" as <br /> shown in detail N on Sheet 4, use %" CDX plywood glued and <br /> screwed to deck framing with 1/8" slope to gutter and with <br /> "Dex-O-Tex" or equal with cant at walls and run continuous into <br /> gutter and 6" up wall behind the siding. Because racking is <br /> eliminated by the plywood deck, you may delete the DTT2s <br /> from the deck joists to the main building's joists, because the <br /> Simpson Heavy-Duty SDS ledger screws in both walls as <br /> specified in above said detail are adequate to hold the deck <br /> from pulling away from the building in both. directions. <br /> If you have any questions, feel free to contact me. Thank you. <br /> '1N gyp, <br /> (i <br /> 99 <br /> g r <br /> /, <br /> IMPRESSION DESIGN <br /> 21h3 C ALU Cn^1 A StHEET.E.ERFTT.L^!A 98201•(425)252 9200 <br />