Laserfiche WebLink
8/15/2019 Page 1 <br /> 10:56:41AM City of Everett <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. C1712-007 Site Address 7109 RAINIER DR G&H <br /> Applied 12/8/2017 Applicant REYKDAL GORDON P Lot <br /> Approved 3/15/2018 Owner REYKDAL GORDON P Block <br /> Issued 3/15/2018 Contractor AERO CONSTRUCTION Tract <br /> Parent Permit No. PW 1709-032 Description NEW DUPLEX-BUILDING(4)G&H-REYKDAL CONDOS <br /> Notes PLANNING INSPECTION REQUIRED PRIOR TO FINAL <br /> CALL KELSEY HEYD 425-257-7275 TO SCHEDULE <br /> Scheduled Completed Tyne Inspector Result Remarks Inspector's Comments <br /> 5/25/2018 5/25/2018 PLUMB DXW CORRECTION Uncover all plumbing pipe in footprint of <br /> 02-GROUND buillding for inspection. <br /> 5/29/2018 5/29/2018 PLUMB DXW APPROVAL <br /> 02-GROUND <br /> 5/30/2018 5/30/2018 BLDG DWF APPROVAL Underslab R-10 rigid foam.OK for <br /> 06-UNDERSLAB concrete <br /> Note:Need to post temporary site address <br /> to continue inspection or pay reinspection <br /> fee. <br /> 6/27/2018 6/27/2018 BLDG DWF PARTIAL APPR (5/8"dens glass)OK <br /> 09-DRYWALL to cover <br /> 6/27/2018 6/27/2018 BLDG DWF PARTIAL APPR 1st floor party walls <br /> 10-INTERIOR OK to cover <br /> 7/9/2018 7/9/2018 BLDG DWF PARTIAL APPR Shear nailing-2nd floor party wall OK <br /> 09-DRYWALL Dry wall nailing 2nd floor party wall <br /> OK to tilt <br /> 7/9/2018 7/9/2018 BLDG DWF PARTIAL APPR Shear nailing-2nd floor party wall OK <br /> 10-INTERIOR Dry wall nailing 2nd floor party wall <br /> OK to tilt <br /> 7/16/2018 7/16/2018 BLDG DWF CORRECTION Not ready <br /> 07-EXTERIOR <br /> 7/17/2018 7/17/2018 BLDG DWF PARTIAL APPR Not ready 10:00am. <br /> 10-INTERIOR 3rd floor(party wall interior shear nailing) <br /> Return at 1:54pm-OK to cover sheetrock. <br /> 7/18/2018 7/18/2018 BLDG DWF PARTIAL APPR 3rd floor(party wall). <br /> 09-DRYWALL Fire wall 5/8"Type X dens glass approved <br /> as noted: <br /> Contractor to mud/tape voids as discussed. <br /> Then OK to flip up walls. <br /> 7/20/2018 7/20/2018 BLDG DWF PARTIAL APPR 3rd floor <br /> 10-INTERIOR <br /> 7/20/2018 7/20/2018 BLDG DWF APPROVAL OK attic gables.OK <br /> 09-DRYWALL to tip up. <br /> 7/25/2018 7/25/2018 BLDG DWF PARTIAL APPR OK to cover <br /> 07-EXTERIOR Garage fronts I-beams,I columns need <br /> special inspection.Arch/engineering bolting <br /> welds letter. <br /> 8/2/2018 8/2/2018 PLUMB DXW APPROVAL As noted Secure water lines,insulate water lines in <br /> 03-ROUGH IN unit. <br /> 8/24/2018 8/24/2018 BLDG DWF PARTIAL APPR OK to cover <br /> 07-EXTERIOR <br /> 9/19/2018 9/19/2018 GAS 01-ROUGH IN DXW APPROVAL Unit H OK 20psi, <br /> unit G OK <br /> 10/8/2018 10/8/2018 MECH 04-ROUGH DXW APPROVAL <br /> IN <br /> 10/10/2018 10/10/2018 BLDG DWF APPROVAL As noted Complete air seal in stairway plates <br /> 08-FRAMING Tighten hold down at double shear wall <br /> panel <br /> Then OK to cover. <br /> 1NSP12 CRWSYSTEMS <br />