Laserfiche WebLink
r r <br /> Stormwater Pollution Prevention Plan <br /> • Section 3 —CONSTRUCTION BMPs. This section provides a detailed <br /> description of the BMPs to be implemented based on the 12 required <br /> elements of the SWPPP (SWMMEW 2004). <br /> • Section 4—CONSTRUCTION PHASING AND BMP <br /> IMPLEMENTATION. This section provides a description of the timing <br /> of the BMP implementation in relation to the project schedule. <br /> • Section 5—POLLUTION PREVENTION TEAM. This section identifies <br /> the appropriate contact names (emergency and non-emergency), <br /> monitoring personnel, and the onsite temporary erosion and sedimentation <br /> control inspector <br /> • Section 6—INSPECTION AND MONITORING. This section provides a <br /> description of the inspection and monitoring requirements such as the <br /> parameters of concern to be monitored, sample locations, sample <br /> frequencies, and sampling methods for all stormwater discharge locations <br /> from the site. <br /> • Section 7—RECORDKEEPING. This section describes the requirements <br /> for documentation of the BMP implementation, site inspections, <br /> monitoring results, and changes to the implementation of certain BMPs <br /> due to site factors experienced during construction. <br /> Supporting documentation and standard forms are provided in the following Appendices: <br /> Appendix A—Site plans <br /> Appendix B—Construction BMPs <br /> Appendix C—Alternative Construction BMP list <br /> Appendix D—General Permit <br /> Appendix E—Site Log and Inspection Forms <br /> Appendix F—Engineering Calculations <br /> 2 <br />