Laserfiche WebLink
1 <br /> Storm water Pollution Prevention Plan <br /> • 10-year stormwater runoff peak flow prior to construction <br /> (existing): 0.49 cfs <br /> • 2-year stormwater runoff peak flow during construction: 0.20 cfs <br /> • 10-year stormwater runoff peak flow during construction: 0.49 cfs <br /> • 2-year stormwater runoff peak flow after construction: 0.20 cfs <br /> • 10-year stormwater runoff peak flow after construction: 0.49 cfs <br /> All stormwater flow calculations are provided in Appendix F. <br /> 4 <br />