Storm water Pollution Prevention Plan <br /> • Design the project to fit the existing topography, soils, and drainage <br /> patterns. <br /> • Emphasize erosion control rather than sediment control. <br /> • Minimize the extent and duration of the area exposed. <br /> • Keep runoff velocities low. <br /> • Retain sediment on site. <br /> • Thoroughly monitor site and maintain all ESC measures. <br /> • Schedule major earthwork during the dry season. <br /> In addition,project management will incorporate the key components listed below: <br /> As this project site is located west of the Cascade Mountain Crest,the project will be managed <br /> according to the following key project components: <br /> Phasing of Construction <br /> • The construction project is being phased to the extent practicable in order <br /> to prevent soil erosion, and,to the maximum extent possible, the transport <br /> of sediment from the site during construction. <br /> • Revegetation of exposed areas and maintenance of that vegetation shall be <br /> an integral part of the clearing activities during each phase of construction, <br /> per the Scheduling BMP (C 162). <br /> Seasonal Work Limitations <br /> • From October 1 through April 30, clearing, grading, and other soil <br /> disturbing activities shall only be permitted if shown to the satisfaction of <br /> the local permitting authority that silt-laden runoff will be prevented from <br /> leaving the site through a combination of the following: <br /> ❑ Site conditions including existing vegetative coverage, slope, soil <br /> type, and proximity to receiving waters; and <br /> ❑ Limitations on activities and the extent of disturbed areas; and <br /> ❑ Proposed erosion and sediment control measures. <br /> 17 <br />