My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3400 RIVERFRONT BLVD BASE FILE 2020-07-15
>
Address Records
>
RIVERFRONT BLVD
>
3400
>
BASE FILE
>
3400 RIVERFRONT BLVD BASE FILE 2020-07-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2020 10:07:54 AM
Creation date
7/15/2020 10:05:41 AM
Metadata
Fields
Template:
Address Document
Street Name
RIVERFRONT BLVD
Street Number
3400
Tenant Name
BASE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stormwater Pollution Prevention Plan <br /> • Based on the information provided and/or local weather conditions,the <br /> local permitting authority may expand or restrict the seasonal limitation on <br /> site disturbance. <br /> ■ The following activities are exempt from the seasonal clearing and grading <br /> limitations: <br /> ❑ Routine maintenance and necessary repair of erosion and sediment <br /> control BMPs; <br /> ❑ Routine maintenance of public facilities or existing utility <br /> structures that do not expose the soil or result in the removal of the <br /> vegetative cover to soil; and <br /> ❑ Activities where there is 100 percent infiltration of surface water <br /> runoff within the site in approved and installed erosion and <br /> sediment control facilities. <br /> Coordination with Utilities and Other Jurisdictions <br /> • Care has been taken to coordinate with utilities, other construction <br /> projects, and the local jurisdiction in preparing this SWPPP and <br /> scheduling the construction work. <br /> Inspection and Monitoring <br /> • All BMPs shall be inspected,maintained, and repaired as needed to assure <br /> continued performance of their intended function. Site inspections shall <br /> be conducted by a person who is knowledgeable in the principles and <br /> practices of erosion and sediment control. This person has the necessary <br /> skills to: <br /> ❑ Assess the site conditions and construction activities that could <br /> impact the quality of stormwater, and <br /> ❑ Assess the effectiveness of erosion and sediment control measures <br /> used to control the quality of stormwater discharges. <br /> • A Certified Erosion and Sediment Control Lead shall be on-site or on-call <br /> at all times. <br /> ■ Whenever inspection and/or monitoring reveals that the BMPs identified <br /> in this SWPPP are inadequate, due to the actual discharge of or potential <br /> to discharge a significant amount of any pollutant, appropriate BMPs or <br /> design changes shall be implemented as soon as possible. <br /> 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.