My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc. 7/13/2020
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc. 7/13/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2020 11:35:40 AM
Creation date
7/20/2020 11:35:29 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc.
Approval Date
7/13/2020
Council Approval Date
7/1/2020
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Alverson Stormwater Separation Project
Public Works WO Number
UP3660
Tracking Number
0001736
Total Compensation
$1,382,275.42
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT CITY <br /> FINAL CONTRACT VOUCHER CERTIFICATION <br /> CONTRACTOR: Rodarte Construction, Inc. ADDRESS: 17 East Valley Hwy E. <br /> CITY: Auburn STATE: WA 98092 DATE: February 6, 2020 <br /> PROJECT TITLE:Alverson Stormwater Separation Project <br /> WORK ORDER NO. UP 3660 <br /> DATE WORK COMPLETE: December 19, 2019 FINAL AMOUNT: $1,382,275.42 <br /> CONTRACTOR'S CERTIFICATION <br /> 1, the undersigned, having first been duly sworn, certify that the attached bill is a proper charge for work <br /> performed and material furnished to the City of Everett, that the same or any part thereof has not been paid, <br /> and that 1 am authorized to sign for the claimant; that I have not rented or purchased any equipment or <br /> materials from any employee of the City; 1 further certify that the attached final estimate is a true and correct <br /> statement showing all the monies due me from the City of Everett under this contract; that I have carefully <br /> examined said final estimate and understand the same and that I hereby release the City of Everett from any <br /> and all claims of whatsoever nature which I may have, arising out of the performance of said contract,which <br /> are not set forth in said estimate.AAek:t <br /> CO RAC R �� TIT(0-1,411(Pr <br /> E ��QQ` �s ow '99/.' <br /> Rodarte Construction, Inc. tCs <br /> NOTARY <br /> Subscribe end swo n to before Ply <br /> me this ! day of �a( �! • <br /> in and for �a&t oNry Public l G ,�� •PF'WAS�‘�`��� <br /> e State Washington, residing at a(f j -tom situ' <br /> PUBLIC WORKS DEPARTMENT CERTIFICATION <br /> I Certify the attached final APPROVED Date: 6 22:2°Zc' <br /> estimate to be based upon actual <br /> measurements and to be true and co rect <br /> X ...ie X <br /> Construction Manager Utilities Director <br /> Tom Fuchs Ryan Sass <br /> INSTRUCTIONS <br /> The Affidavit of Wages Paid must be prepared by the prime contractor, all subcontractors, and all <br /> subcontractor's agents and forwarded with the Final Contract Voucher Certification. <br /> Contractor's Claims, if any, must be included and the Contractor's Certification must be labeled indicating a <br /> claim attached. <br /> Revised 9/94 <br />
The URL can be used to link to this page
Your browser does not support the video tag.