Laserfiche WebLink
CERTIFICATE OF COMPLETION <br /> Project: Alverson Stormwater Separation Project <br /> Contractor: Rodarte Construction, Inc. <br /> Work Order No. UP3660 <br /> The above-mentioned project was constructed per the plans and specifications and <br /> to the satisfaction of the Public Works Department. <br /> The Contractor physically completed the project, within the time allowed in the <br /> contract. <br /> It is recommended that the City accept this project as complete. <br /> Recommended by: <br /> (�-22-20 LU <br /> is Works Director Date <br /> Ryan Sass <br /> Approved b • <br /> 4 -� <br /> 00 <br /> ayor, .'`Mr'erett Date <br /> Cassie Fran in <br /> Att-:,y 41 441 <br /> City Clerk <br /> Sharon Fuller <br /> APPROVED AS TO FORM <br /> 13 .62A -4 )zkol <br /> avid C. Hall, City A orney <br /> Date <br />