Laserfiche WebLink
DRAWING INDEX DRAWING INDEX (CONT'D) DRAWING INDEX (CONT'D) <br /> SHEET N0. DWG N0. REV N0. DRAWING TITLE SHEET N0. DWG N0. REV N0. DRAWING TITLE SHEET N0. DWG N0. REV N0. DRAWING TITLE <br /> GENERAL 44 C3.2 2 WATER PLAN (2 OF 2) 97 514.9 1 MOBILE HARBOR CRANE POWER VAULT DETAILS (2 OF 2) <br /> 1 G1.0 2 TITLE SHEET & LOCATION PLAN 45 C3.3 1 WATER DETAILS (1 OF 2) 98 514.10 1 VAULT PLACARD DETAILS <br /> 2 G1.1 4 INDEX SHEET (1 OF 2) 46 C3.4 2 WATER DETAILS (2 OF 2) 99 515.1 2 UTILITY VAULT DETAILS <br /> 3 GL2 4 INDEX SHEET (2 OF 2) AND ABBREVIATIONS 47 C3.5 2 WATER PROFILE 100 S16.1 3 STOW PIN DETAILS (1 OF 2) <br /> 4 G1.3 2 GENERAL NOTES, LEGEND & UTILITI' STRUCTURE LOADWG 48 C4.1 2 STORM DRAIN PLAN 101 516.2 1 STOW PIN DETAILS (2 OF 2) <br /> - G2J 0 NOT USED 49 C4.2 1 STORM DRAIN PROFILE AND DETAILS 102 S17.1 3 CRANE STOP DETAILS (WATERSIDE) <br /> 5 G3.1 1 SITE PLAN AND SURVEY CONTROL 50 C4.3 1 STORM DRAIN DETAILS (1 OF 3) 103 S17.2 3 CRANE STOP DETAILS (LANDSIDE) <br /> 6 G3.2 1 SITE ACCESS PLAN 51 C4.4 1 STORM DRAIN DETAILS (2 OF 3) 104 517.3 2 SECTIONS AT CRANE STOP <br /> CONSTRUCTION ACCESS AND STAGING ENLARGED PLAN 52 C4.5 1 STORM DRAIN DETAILS (3 OF 3) 105 S18.1 2 PIPE BOLLARD DETAILS <br /> 7 G3.3 � (1 OF 3) <br /> CONSTRUCTION ACCESS AND STAGiNG ENLARGED PLAN NIC £lr� � . 106 518.2 2 REMOVABLE BOLLARD DETAI�S <br /> 8 G3.4 � (2 OF 3) NIC £rr � 107 519.1 2 REMOVABLE BULLRAIL DETAILS (1 OF 2) <br /> CONSTRUCTION ACCESS AND STAGING ENLARGED PLAN 55 C6.1 2 STRIPING PLAN (1 OF 2) 108 S19.2 1 REMOVABLE BULLRAIL DETAILS (2 OF 2) <br /> w 9 G3.5 1 (3 OF 3) 56 C6.2 1 STRIPING PLAN (2 OF 2) 109 520.1 1 LADDER DETAILS (1 OF 2) <br /> � 10 G4.1 1 PROJECT MILESTONE PHASING PLAN i <br /> z 57 C6.3 1 STRIPING DETAILS 110 520.2 � 1 LADDER DETAILS (2 OF 2) <br /> � DEMOLITION STRUCTURAL 111 521.1 1 FENDER SYSTEM RE-ATTACHMENT DETAILS (1 OF 3) <br /> o� 11 D1.1 3 WHARF DEMOLITION PLAN (1 OF 4) 58 51.1 2 STRUCTURAL GENERAL NOTES (1 OF 3) 112 521.2 1 FENDER SYSTEM RE-ATTACHMENT DETAILS (2 OF 3) <br /> 0 12 D1.2 2 WHARF DEMOLITION PLAN (2 OF 4) 59 51.2 1 STRUCTURAL GENERAL NOTES (2 OF 3) 113 S21.3 3 FENDER SYSTEM RE-ATTACHMENT DETAILS (3 OF 3) <br /> � 13 D1.3 2 WHARF DEMOLITION PLAN (3 OF 4) 60 51.3 1 STRUCTURAL GENERAL NOTES (3 OF 3) 114 522.1 3 UTILITY CONDUIT DETAILS (1 OF 2) <br /> � 14 D1.4 1 WHARF DEMOLITION PLAN (4 OF 4) 61 52.1 3 SURFACE FEATURES PLAN (1 OF 2) 115 5222 1 UTIUTY CONDUIT DETAILS (2 OF 2) <br /> � 15 D21 2 UTILITY AND PAVEMENT DEMOLITiON PLAN (1 OF 3) 62 52.2 2 SURFACE FEATURES PLAN (2 OF 2) 116 S223 2 PROTECTION VAULT DETAILS <br /> � 16 D2.2 1 UTILITY AND PAVEMENT DEMOLITION PLAN (2 OF 3) 63 53.1 1 PILE PLAN (1 OF 2) 117 523.1 2 PILE CAP REPAIR NOTES <br /> Z 17 D2.3 1 UTILITY AND PAVEMENT DEMOLITION PLAN (3 OF 3) 64 S3.2 1 PILE PLAN (2 OF 2) 118 523.2 1 PILE CAP REPAIR PLAN <br /> � 18 D3.1 2 UPLAND BUILDING DEMOLITION PLAN 65 54.1 4 WHARF FRAMING PLAN (1 OF 4) 119 524.1 2 PILE CAP REPAIR ELEVATION (1 OF 28) <br /> 0 19 D3.2 1 UPLAND BUILDING DEMOUTION DETAILS 66 54.2 3 WHARF FRAMING PLAN (2 OF 4) 120 524.2 2 PILE CAP REPAIR ELEVATION (2 OF 28) <br /> O - D3.3 0 NOT USED 67 54.3 3 WHARF FRAMING PLAN (3 OF 4) 121 524.3 2 PILE CAP REPAIR ELEVATION (3 OF 28) <br /> w , � ��. <br /> �i NIC $3:� � nT��'n�� �b'�o��o����Tr 68 S4.4 2 WHARF FRAMING PLAN (4 OF 4) 122 524.4 2 PILE CAP REPAIR ELEVATION (4 OF 28) <br /> m 69 S5.1 1 WHARF TYPICAL SECTION (1 OF 3) 123 524.5 2 PILE CAP REPAIR ELEVATION (5 OF 28) <br /> � NIC �3� } **�"'"T " 70 55.2 1 WHARF TYPICAL SECTION (2 OF 3) 124 524.6 2 PILE CAP REPAIR ELEVATION (6 OF 28) <br /> � 22 D4.1 1 WHARF DEMOLITION SECTION (1 OF 2) 71 55.3 1 WHARF TYPICAL SECTION (3 OF 3) 125 S24J 2 PILE CAP REPAIR ELEVATiON (7 OF 28) <br /> 0 23 D4.2 1 WHARF DEMOLITION SECTION (2 OF 2) 72 56.1 2 PILE DETAILS 126 S24.8 2 PILE CAP REPAIR ELEVATION (8 OF 28) <br /> LL 24 D5.1 1 DEMOL!TION DETAILS (1 OF 5) <br /> a 73 56.2 1 PILE CONNECTION DETAILS 127 524.9 2 PILE CAP REPAIR ELEVATION (9 OF 28) <br /> Y 25 D5.2 1 DEMOUTION DETAILS (2 OF 5) <br /> 0 74 57.1 1 NEW PILE CAP DE7AiLS (1 OF 2) 128 524.10 2 PILE CAP REPAIR ELEVATION (10 OF 28) <br /> � 26 D5.3 1 DEMOLITION DEfAILS (3 OF 5) 75 57.2 1 NEW PILE CAP DETAILS (2 OF 2) 129 S24.11 2 PiLE CAP REPAIR ELEVATiON (11 OF 28) <br /> � 27 D5.4 2 DEMOLITION DETAILS (4 OF 5) <br /> 76 58.1 1 PILE CAP STRENGTHENING DETAILS 130 524.12 2 PILE CAP REPAIR ELEVATION (12 OF 28) <br /> � 28 D5.5 1 �DEMOUTION DETAILS (5 OF 5) <br /> M 77 58.2 1 PILE CAP CLOSURE POUR DETAILS 131 524.13 2 PILE CAP REPAIR ELEVATION (13 OF 28) <br /> o CML �g gg � � WATERSIDE CRANE BEAM ELEVATIONS (1 OF 2) 132 524.14 2 PILE CAP REPAIR ELEVATION (14 OF 28) <br /> `O 29 C1.1 � �,TESC & 7EMPORARY EXCAVATION MATERIAL STOCKPILE PLAN �g 5g z Z WqTERSIDE CRANE BEAM ELEVATIONS (2 OF 2) 133 S24.15 2 PILE CAP REPAIR ELEVATION (15 OF 28) <br /> � ,(1 OF 3) <br /> � TESC & TEMPORARY EXCAVATION MATERIAL STOCKPILE PLAN 80 S10.1 1 WATERSIDE CRANE BEAM SECTIONS (1 OF 3) 134 524.16 2 PILE CAP REPAIR ELEVATION (16 OF 28) <br /> � 30 C1.2 � (Z OF 3) 81 510.2 2 WATERSIDE CRANE BEAM SECTiONS (2 OF 3) 135 524.17 2 PILE CAP REPAIR ELEVATION (17 OF 28) <br /> c 31 C1.3 � TESC & TEMPORARY EXCAVATION MATERIAL STOCKPILE PLAN g2 �510.3 2 WATERSIDE CRANE BEAM StCTIONS (3 OF 3) 136 524.18 2 PILE CAP REPAIR ELEVATION (18 OF 28) <br /> E (3 OF 3) <br /> � 32 C1.4 1 TESC & TEMPORARY EXCAVATION MATERIAL STOCKPILE DETAILS 83 �510.4 2 WATERSIDE CRANE BEAM REINFORCING ELEVATIONS (1 OF 2) 137 S24J9 2 PILE CAP REPAIR ELEVATION (19 OF 28) <br /> ` 33 C21 2 GRADING AND PAVING PLAN (1 OF 3) 84 510.5 2 WATERSIDE CRANE BEAM REINFORCING ELEVATIONS (2 OF 2) 138 524.20 2 PILE CAP REPAIR ELEVATION (20 OF 28) <br /> � 34 C22 2 GRADING AND PAVING PLAN (2 OF 3) 85 511.1 1 LANDSIDE CRANE BEAM SECTIONS (1 OF 2) 139 524.21 2 PILE CAP REPAIR ELEVATION (21 OF 28) <br /> > 35 C2.3 1 GRADING AND PAVING PLAN (3 OF 3) 86 511.2 1 LANDSIDE CRANE BEAM SECTIONS (2 OF 2) 140 524.22 2 PILE CAP REPAIR ELEVATiON (22 OF 28) <br /> LL' 87 5121 1 CRANE RAIL DETAILS 141 524.23 2 PILE CAP REPAIR ELEVATION (23 OF 28) <br /> 0 36 C2.4 1 GRADING AND PAVING SFCTIONS <br /> a 37 C25 2 GRADING AND PAVING DETAILS 88 S13.1 2 CRANE POWER TRENCH DETAILS 142 524.24 2 PILE CAP REPAIR ELEVATION (24 OF 28) <br /> 0 89 514.1 1 CRANE POWER VAULT DETAILS (1 OF 4) 143 524.25 2 PILE CAP REPAIR ELEVATION (25 OF 28) <br /> ELECTRICAL OUCT RAIL CROSSING PRCFILE AND DETAILS <br /> 0 38 C2.6 1 �� �F Z� 90 514.2 1 CRANE POWER VAULT DETAILS (2 OF 4) 144 524.26 2 PILE CAP REPAIR ELEVATION (26 OF 28) <br /> `O ELECTRICAL DUCT RAIL CROSSING PROFILE AND DEfAILS 91 514.3 1 CRANE POWER VAULT DETAILS (3 OF 4) 145 S24.27 2 PILE CAP REPAIR ELEVATION (27 OF 28) <br /> � 3g �2.� Z (2 OF 2) 92 514.4 1 CRANE POWER VAULT DETAILS (4 OF 4) 146 524.28 2 PILE CAP REPAIR ELEVATION (28 OF 28) <br /> wao cz.a , IE�EcrR�ca� oucTeaNK PROFi�E 93 sia.s i sHORE PowER vAu�r oEra��s �i oF �) DRAWING INDEX (CONT'D ON G1 .2) <br /> � ELECTRICAL SUBSTATION CONCRETE SLAB & UTILITY 94 514.6 1 SHORE POWER VAULT DETAILS (2 OF 2) <br /> � 41 C2.9 � STRUCT. FOUNDATION DETAILS <br /> � 42 CZ10 1 ELECTRICAL SUBSTATION SLAB S�RUCTURAL GENERAL NOTES g5 St 4.7 1 CRANE FBER OPTIC VAULT DETAILS R EC 0 R D D RAW I N G S <br /> Z 43 C3.1 3 WATER PLAN (1 OF 2) 96 S14.8 1 MOBILE HARBOR CRANE POWER VAULT DETAILS (1 OF 2) IF SHEET IS LESS THAN 22x34 <br /> � REDUCE SCALE ACCORDINGLY <br /> � <br /> w <br /> PR°�"i `"°"_�� S�A`_ pORT OF EVERETT °W� "° <br /> w RECORD CONDITIONS <br /> z A. BERGMAN AS SHOWN <br /> Q ILLUSTRATED IN THESE s�cNf:o a� �nrr � ■ <br /> � Port of o 05�29�Zo SK ������ �HAW�,�� PLANSREFLECT SOUTH TERMINAL WHARF & <br /> � s. sTORv i z/oa/zo n c= vo. <br /> 8 c�/��z/i9 sK �P�_nn� cPv & �aa-.E s�Or INFORMATION 1-8-001-06 <br /> w PROVIDEDBYTHE �4�WN aY�. �.-:-�Kto BY� ELECTRICAL UPGRADES-PHASE 2 <br /> � 8 ea/'�/ia n�w aoR� �Eo cr,nNCE To au��Rn,_ <br /> > 16015th Avenue,Sulte 1300 CONTRACTOR.RECORD L LEMONS N. WATSON ?Ro�=CT <br /> w � ^ B O X 5 3 8 � ��/'�/�B NW �0�\'FORMED DRAW NGS r <br /> � CVCR=TT, wq o�ZpS Seattle,Washington98101 � CONDITIONSWERENO A°'RovFo A�: I N D E X S H E E T (� �f 2 ��� MT-ST-2017-11 <br /> � - (206) 382-0600 FdX(206)382-OSDO � Z�Og '� SK ISSUEJ FDR 81D Av� PERMiT <br /> o ;a?5) zs9-3i6a PROJECTN0.1600120 No. �nre av REv-sioN No on-_ er aEv�soN VERIFIEDBYENGINEER. 5�.-��E' No. 2 OF 185 <br /> a <br />