Laserfiche WebLink
DRAWING INDEX (CONT'D) ABBREVIATIONS <br /> SHEET N0. DWG N0. REV N0. DRAWING TITLE <br /> ABBREV'NS ABBREVIATIONS LOC LOCATION <br /> 147 525.1 1 PILE CAP REPAIR DETAILS (1 OF 2) APPROX APPROXIMATE LS LANDSIDE <br /> 148 525.2 1 PILE CAP REPAIR DETAILS (2 OF 2) A/C, ASPH ASPHALT CONCRETE MAT'LS MATERIALS <br /> ACP ASPHALT CONCRETE PAVEMENT MH MANHOLE <br /> 149 SK1 1 UPLAND CPV PARTIAL PLAN AL ALUMINUM MHHW MEAN HIGHER HIGH WATER <br /> 150 SK2 1 CABLE SLOT AND CRANE CABLE DUCTBANK BGS BELOW GROUND SURFACE MHW MEAN HIGH WATER <br /> BMP BEST MANAGEMENT PRACTICE MIN MINIMUM <br /> 151 SK3 1 CABLE SLOT DETAILS BOT BOTTOM MLLW MEAN LOWER LOW WATER <br /> 152 SK4 1 UPLAND CPV DETAILS 8P BURIED POWER MLW MEAN LOW WATER <br /> 8/W BETWEEN MSRC MARWE SPILL RESPONSE CORPORATION <br /> 153 SKS 1 CPV & CABLE TRANSITION BOX CAP CAPACITY NTS NOT TO SCALE <br /> 154 SK6 1 FABRICATED FLANGED FITTING CAPWAP CASE PILE WAVE ANALYSIS PROGRAM OC ON CENTER <br /> CB CATCH BASIN OHW ORDINARY HIGH WATER <br /> ELECTRICAL CEM CEMENT OPP OPPOSITE <br /> 155 E1.1 2 LEGEND, ABBREVIATIONS & GENERAL NOTES CI CAST IRON OWS OIL/WATER SEPARATOR <br /> CL CENTERLWE PDA PILE DRIVING ANALYSER <br /> � 156 E2.1 2 ELECTRICAL DEMOLITION KEY PLAN CLF CHAIN LINK FENCE PRV PRESSURE REDUCING VALVE <br /> x CLR CLEARANCE PSI POUNDS PER SOUARE INCH <br /> wo 157 E2.2 3 ELECTRICAL DEMOLITION PLAN-WHARF (1 OF 2) CMP CORRUGATED METAL PIPE PVC POLYVINYL CHLORIDE <br /> � 158 E2.3 2 ELECTRICAL DEMOLITION PLAN-WHARF (2 OF 2) CO CLEANOUT PVMT PAVEMENT <br /> � 159 E3.1 3 ELECTRICAL KEY PLAN CONC CONCRETE REF REFERENCE DIMENSION <br /> CONN CONNECTION REPL REPLACE <br /> 0 160 E3.2 4 WHARF ELECTRICAL PLAN (1 OF 2) CONT CONTINUOUS REQ'D REQUIRED <br /> 0 161 E3.3 3 WHARF ELECTRICAL PLAN (2 OF 2) CONT'D CONTINUED REV REVISION <br /> � COE CITY OF EVERETT RD ROAD <br /> � 162 E3.4 2 UPLAND ELECTRICAL PLAN CP CONCRETE PIPE RPBA REDUCED PRESSURE BACKFLOW <br /> � CPV CRANE POWER VAULT ASSEMBLY <br /> 163 E3.5 3 WHARF SUBSTATION PLAN <br /> 3 RW RETAINING WALL <br /> ' 164 E3.6 2 UPLAND ELECTRICAL SERVICE EQUIPMENT - PLAN CRB CRUSHED ROCK BASE SCH SCHEDULE <br /> � <br /> CSO COMBINED SEWER OVERFLOW <br /> N 165 E3J 2 GROUNDING GRID PLANS SD STORM DRAIN <br /> � CTR CENTER SDFM STORM DRAIN FORCE NAIN <br /> Z DEMO DEMOLITION <br /> � 166 E4.1 2 ONE-UNE DIAGRAM DEMOLITION DI DUCTILE IRON SDMH STORM DRAIN MANHOLE <br /> ¢ SF STORM FILTER <br /> 0 167 E5.1 2 MEDIUM VO�TAGE ONE-LINE DIAGRAM D�ISA, DIAM DOWNSPOUT <br /> SIM SIMILAR <br /> � 168 E5.2 2 WHARF LOW VOLTAGE ONE-LWE DIAGRAM DWG DRAWING SS SANITARY SEWER, STAINLESS STEEL <br /> � i r ECD ELECTRICAL CONDUIT SSFM SANITARY SEWER FORCE MAIN <br /> c� 169 E5.3 2 YARD SUBSTATION LOW VOL�AGE ONE-LINE DIAGRAM ED ELECTRICAL DUCTBANK <br /> w SSMH SANITARY SEWER MANHOLE <br /> �i 170 �E6.1 2 DUCTBANK SECTIONS EF EACH FACE SSS SIDE SANITARY SEWER <br /> � 171 E62 2 DUCTBANK SECTIONS EHW EXTREME HIGH WATER ST STREET <br /> � EL, ELEV ELEVATION STD STANDARD <br /> 0 172 E6.3 3 DUCTBANK SECTIONS ELW EXTREME LOW WATER SYMM SYMMEiRIC <br /> m 173 E6.4 2 ELECTRICAL DETAILS EM ELECTRICAL METER 7&B TOP AND BOTTOM <br /> �, EOP EDGE OF PAVEMENT TB THRUST BLOCK <br /> � 174 E6.5 3 ELECTRICAL DETAILS TD TRENCH DRAIN <br /> LL EV ELECTRICAL VAULT <br /> a 175 E6.6 2 ELECTRICAL DETAILS EX, EXIST EXISTING �'P 11'PICAL <br /> Y FH FIRE HYDRANT UGP UNDERGROUND POWER <br /> � 176 E6J 2 ELECTRICAL DETAILS FL FLOW LWE UNC UMFIED NATIONAL COARSE <br /> o FO FBER OPTIC UNO UNLESS NOTED OTHERWISE <br /> � 177 E6.8 3 BENT SECTIONS FT FEET VERT VERTICAL <br /> 178 E6.9 3 BENT SECTIONS G GAS VIF VERIFY IN FIELD <br /> � 179 E6.10 3 VAULTS AND HANDHOLE SCHEDULE GALV GALVAM ZED WHS WELDED HEADED STUD <br /> o GS GROUND SURFACE <br /> 0 180 E6.11 1 LIGHTING CONTROL DIAGRAM GV GATE VALVE W/ WITH <br /> � 181 E7.1 2 PANEL SCHEDULES GVL GRAVEL W�0 WITHOUT <br /> HAZMAT HAZARDOUS MATERIALS WABO WASHINGTON ASSOCIATION OF <br /> � 182 E7.2 3 PANEL SCHEDULES HDPE HIGH DENSITY POLYETHYLENE BUILDING OFFICIALS <br /> n HMA HOT NIX ASPHALT WM WATER MAIN <br /> � 183 E8.1 3 CONDUIT AND CONDUCTOR SCHEDULE <br /> � HORIZ HORIZONTAL WS WATERSIDE <br /> 184 E8.2 3 CONDUIT AND CONDUCTOR SCHEDULE IE INVERT ELEVATION WCB WATERSIDE CRANE BEAM <br /> � 185 E8.3 3 'CONDUIT AND CONDUCTOR SCHEDULE KLF KIPS PER LINEAL FOOT <br /> � LCB LANDSIDE CRANE BEAM <br /> - LF LINEAR FEET <br /> � <br /> � <br /> n <br /> m <br /> a� <br /> w' <br /> `o <br /> r <br /> 0 <br /> a <br /> 0 <br /> N <br /> O <br /> O <br /> � <br /> � <br /> O <br /> N <br /> Z <br /> � <br /> W <br /> ❑ <br /> � <br /> � RECORD DRAWINGS <br /> Q <br /> Z IF SHEET IS LESS THAN 22x34 <br /> � REDUCE SCALE ACCORDINGLY <br /> � <br /> w <br /> ~ �R°�E`T E"�'"=ER' '`A`E pORT OF EVERETT <br /> w RECORD CONDITIONS DWG. N0. <br /> z A. BERGMAN AS SHOWN <br /> � ILLUSTRATED IN THESE ■ <br /> � Port o,f � CS/29/2D SK R_CORD DRAWWGS PLANS REFLECT �ESiGNCD Bv �nTE <br /> � s. sTORY ��/o8/�ov SOUTH TERMINAL WHARF & �,v N� <br /> 8 c� 2 i5 sK �p�na� cav & cne�E s�oT INFORMATION <br /> �' � 1-8-001-O6 <br /> � ����'j"j' e �ei,oi,B NW po�, �to �HA„�� To B���RA,_ PRovioEOBvrHE �RAWN B� ����KEo BY ELECTRICAL UPGRADES-PHASE 2 <br /> > 1601 Sth Avenue,Suite 1300 T. LEMONS N. WATSON ��o�ECT <br /> w � goX �38 0 �,,,o,,e NW ��,tiFORME� oRAW,h�s CONTRACTOR.RECORD I N D E X S H E ET (2 0 F 2) <br /> o � Seattle,Washington 98101 B �Z�o3/��� sK i55uFo FOR aio nao pERn�iT CONDITIONS WERE NO A°PRov[o sv: ��� MT-ST-2017-11 <br /> =v=�7�Ti, WA 98706 <br /> � (2D6) 382-0600 Fax(206)382-D500 VERIFIEDBYENGINEER. QN� ABBREVIATIONS S��E'i No 3 �F 185 <br /> � �`z'� zs9-3�E` PROJECT N0.160D120 mo �n-� a� �iv <br /> p 5 0� NO �JA'; BV �:v��5�': <br /> a <br />