My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2721 WETMORE AVE MARQUEE APARTMENTS Plans 2024-06-18
>
Address Records
>
WETMORE AVE
>
2721
>
MARQUEE APARTMENTS
>
Plans
>
2721 WETMORE AVE MARQUEE APARTMENTS Plans 2024-06-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2024 2:56:17 PM
Creation date
7/23/2020 9:26:58 AM
Metadata
Fields
Template:
Address Document
Street Name
WETMORE AVE
Street Number
2721
Tenant Name
MARQUEE APARTMENTS
Permit
B1911-008
Notes
TOWER CRANE INFORMATION
Address Document Type
Plans
Imported From Microfiche
No
Supplemental fields
Description (Filename)
Untitled
Status
Active
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
T r <br /> COMAIRCIAL <br /> GREATER SEA E CONCRETE cr.ISTRra� <br /> SUBNIITTAL <br /> REMEidTt;:t. <br /> TRANSMITTAL <br /> Project:Marquee Apartments Date: 10/29/19 <br /> Everett A/E Project Number: <br /> TRANSMITTAL To(Contractor):Skotdal Date: 10/29/19 Submittal No 10 it should be 09 <br /> AFrom(Subcontractor):Greater Seattle Concrete By:Tai Do 0 Resubmission <br /> Qty. Reference/ Title/Description/ Spec.Section Title and Paragraph/ <br /> Number Manufacturer Drawing Detail Reference <br /> Greater Seattle Concrete,Inc. <br /> 1 Product Data Crane pad-Mix Design <br /> la Reviewed without aR33 Y eXi(ai:prions. <br /> ❑ Rejected <br /> GSC Submittal No <br /> Reviewed By / :2C <br /> Sub/Supplier R1t.e54'6-4142-SZ <br /> Spec.No <br /> Project <br /> REVIEW DUES NOT RELIEVE SUBCONTRACTORS <br /> OR SUPPLIER FROM REQUIREMENTS OF CONTRACT <br /> PLANS AND SPECIFICATIONS <br /> ®Submitted for review and approval 0 Substitution involved-Substitution request attached <br /> ❑Resubmitted for review and approval 0 If substitution involved,submission includes point-by-point <br /> 0 Complies with contract requirements comparative data or preliminary details <br /> ❑Will be available to meet construction schedule 0 Items included in submission will be ordered <br /> 0 A/E review time included in construction schedule immediately upon receipt of approval <br /> Other remarks on above submission: <br /> TRANSMITTAL To(A/E): Attn: Date Rec'd by Contractor: <br /> BFrom(Contractor): By: Date Trnsmt'd by Contractor: <br /> ❑Approved 0 Revise/Resubmit <br /> ❑Approved as noted 0 Rejected/Resubmit <br /> Other remarks on above submission: ' 0 One copy retained by sender <br /> TRANSMITTAL To(Contractor): Attn: Date Rec'd by A/E: <br /> C From(A/E): ❑Other By: Date Trnsmt'd by A/E: <br /> ❑Approved 0 Provide file copy with corrections identified <br /> ❑Approved as noted 0 Sepia copies only returned <br /> ❑Not subject to review <br /> ❑No action required ❑Point-by-point comparative data required <br /> ❑Revise I Resubmit to complete approval process <br /> 0 Rejected/Resubmit <br /> ❑Approved as noted/Resubmit 0 Submission Incomplete/Resubmit <br /> Other remarks on above submission: 0 One copy retained by sender <br /> rv.s �r <br />
The URL can be used to link to this page
Your browser does not support the video tag.