Laserfiche WebLink
SAEZ IIHOUG3NJgirl© FAlaHULVI <br /> 3.-Place the insertion crane section inside the ditch over the levelling cubes or over the <br /> blinding cement, for such purpose you have a useful assembly element or jig clamp, which <br /> allows you to screw the four legs of the insertion crane section,and afterwards you can place <br /> them in the ditch with the help of a crane. <br /> Each crane section must be screwed with the corresponding rods, this way the insertion came <br /> section S75R/16/22 is screwed with the rods M45 and the S75R/16/26&S75R/24/26 with the <br /> rod M52.Fixing may be done with an impact wrench,without a hydraulic torque wrench. <br /> Once the legs are set on the jig clamp,it is VERY IMPORTANT not to hit the legs as these turn <br /> and not fully coincide with the tower section of the crane,see figure 18. <br /> CAUTION <br /> Insertion cranepssembl i Insertion crane <br /> Assembly jig section beam clamp Y 1 g section beam <br /> clamp <br /> b., <br /> WI <br /> w. ,,. 4 <br /> Figure 18 <br /> The hoisting of the jig clamp with the insertion section legs assembled is carried out according <br /> to the following figure and by means of suitable weight hoisting equipment: <br /> SCREWS WEIGHTS <br /> r <br /> , :^-1;)/ UNIT TOTAL <br /> / DENOMINATION QUANTITY WEIGHT WEIGHT <br /> Assembly jig clamp (kg) (kg) <br /> i1 '--�;�`IIII IF-575R/16/22 4 424 1696 <br /> Imo, <br /> TE-S758/16/26 4 606 2424 <br /> I I INSERTION <br /> JIG 1 450 450 <br /> SECTION LEGS <br /> ri <br /> ii 1 MI <br /> CHAPTER 5A-ERECTION WITH ANCHOR VERSION /7 <br /> February 2015_Rev.0.1 <br />