My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2721 WETMORE AVE MARQUEE APARTMENTS Plans 2024-06-18
>
Address Records
>
WETMORE AVE
>
2721
>
MARQUEE APARTMENTS
>
Plans
>
2721 WETMORE AVE MARQUEE APARTMENTS Plans 2024-06-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2024 2:56:17 PM
Creation date
7/23/2020 9:26:58 AM
Metadata
Fields
Template:
Address Document
Street Name
WETMORE AVE
Street Number
2721
Tenant Name
MARQUEE APARTMENTS
Permit
B1911-008
Notes
TOWER CRANE INFORMATION
Address Document Type
Plans
Imported From Microfiche
No
Supplemental fields
Description (Filename)
Untitled
Status
Active
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAEZ IIHOUG3NJgirl© FAlaHULVI <br /> 3.-Place the insertion crane section inside the ditch over the levelling cubes or over the <br /> blinding cement, for such purpose you have a useful assembly element or jig clamp, which <br /> allows you to screw the four legs of the insertion crane section,and afterwards you can place <br /> them in the ditch with the help of a crane. <br /> Each crane section must be screwed with the corresponding rods, this way the insertion came <br /> section S75R/16/22 is screwed with the rods M45 and the S75R/16/26&S75R/24/26 with the <br /> rod M52.Fixing may be done with an impact wrench,without a hydraulic torque wrench. <br /> Once the legs are set on the jig clamp,it is VERY IMPORTANT not to hit the legs as these turn <br /> and not fully coincide with the tower section of the crane,see figure 18. <br /> CAUTION <br /> Insertion cranepssembl i Insertion crane <br /> Assembly jig section beam clamp Y 1 g section beam <br /> clamp <br /> b., <br /> WI <br /> w. ,,. 4 <br /> Figure 18 <br /> The hoisting of the jig clamp with the insertion section legs assembled is carried out according <br /> to the following figure and by means of suitable weight hoisting equipment: <br /> SCREWS WEIGHTS <br /> r <br /> , :^-1;)/ UNIT TOTAL <br /> / DENOMINATION QUANTITY WEIGHT WEIGHT <br /> Assembly jig clamp (kg) (kg) <br /> i1 '--�;�`IIII IF-575R/16/22 4 424 1696 <br /> Imo, <br /> TE-S758/16/26 4 606 2424 <br /> I I INSERTION <br /> JIG 1 450 450 <br /> SECTION LEGS <br /> ri <br /> ii 1 MI <br /> CHAPTER 5A-ERECTION WITH ANCHOR VERSION /7 <br /> February 2015_Rev.0.1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.