Laserfiche WebLink
A <br /> AEZ OM 4 tL HULAI <br /> 4112 Cog 1104 <br /> Place the crane section in the ditch and level it well by means of screws M24 in the lower part <br /> of the legs,the level must be taken at the top part of the jig clamp, which is perfectly rectified <br /> for such purpose, therefore you must verify the level from corner to corner as well as <br /> diagonally.See figure 19. We recommend that once the crane section is levelled, you must fix <br /> the legs to the ground by means of concrete in order to avoid possible movements of these <br /> during the works undertaken afterwards. <br /> LEVEL <br /> ;MI <br /> 1 .. <br /> Figure 19 <br /> No irregularity in the level that is greater than 1/500 of tower height will be admissible. <br /> Then placing the lower mesh of B500S 025 mm every 15 cm,as shown on figure 15,16&20 <br /> The level off allowed,cannot exceed at all 1/500. <br /> The level of the tower mast section or assembly jig <br /> clamp must be checked,together with the anchor,this <br /> one must be done following the instructions given on <br /> the foundation Project,according to the reactions and <br /> efforts given by the manufacturer. <br /> • <br /> 001-7. <br /> —_-- Figure 20 <br /> CHAPTER 5A-ERECTION WITH ANCHOR VERSION <br /> February 2015_Rev.0.1 <br />