My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2721 WETMORE AVE MARQUEE APARTMENTS Plans 2024-06-18
>
Address Records
>
WETMORE AVE
>
2721
>
MARQUEE APARTMENTS
>
Plans
>
2721 WETMORE AVE MARQUEE APARTMENTS Plans 2024-06-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2024 2:56:17 PM
Creation date
7/23/2020 9:26:58 AM
Metadata
Fields
Template:
Address Document
Street Name
WETMORE AVE
Street Number
2721
Tenant Name
MARQUEE APARTMENTS
Permit
B1911-008
Notes
TOWER CRANE INFORMATION
Address Document Type
Plans
Imported From Microfiche
No
Supplemental fields
Description (Filename)
Untitled
Status
Active
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A <br /> AEZ OM 4 tL HULAI <br /> 4112 Cog 1104 <br /> Place the crane section in the ditch and level it well by means of screws M24 in the lower part <br /> of the legs,the level must be taken at the top part of the jig clamp, which is perfectly rectified <br /> for such purpose, therefore you must verify the level from corner to corner as well as <br /> diagonally.See figure 19. We recommend that once the crane section is levelled, you must fix <br /> the legs to the ground by means of concrete in order to avoid possible movements of these <br /> during the works undertaken afterwards. <br /> LEVEL <br /> ;MI <br /> 1 .. <br /> Figure 19 <br /> No irregularity in the level that is greater than 1/500 of tower height will be admissible. <br /> Then placing the lower mesh of B500S 025 mm every 15 cm,as shown on figure 15,16&20 <br /> The level off allowed,cannot exceed at all 1/500. <br /> The level of the tower mast section or assembly jig <br /> clamp must be checked,together with the anchor,this <br /> one must be done following the instructions given on <br /> the foundation Project,according to the reactions and <br /> efforts given by the manufacturer. <br /> • <br /> 001-7. <br /> —_-- Figure 20 <br /> CHAPTER 5A-ERECTION WITH ANCHOR VERSION <br /> February 2015_Rev.0.1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.