My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2721 WETMORE AVE MARQUEE APARTMENTS Plans 2024-06-18
>
Address Records
>
WETMORE AVE
>
2721
>
MARQUEE APARTMENTS
>
Plans
>
2721 WETMORE AVE MARQUEE APARTMENTS Plans 2024-06-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2024 2:56:17 PM
Creation date
7/23/2020 9:26:58 AM
Metadata
Fields
Template:
Address Document
Street Name
WETMORE AVE
Street Number
2721
Tenant Name
MARQUEE APARTMENTS
Permit
B1911-008
Notes
TOWER CRANE INFORMATION
Address Document Type
Plans
Imported From Microfiche
No
Supplemental fields
Description (Filename)
Untitled
Status
Active
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
$ 1 I <br /> . ' aNgtir 3M©4'Il0[n�g MA N Mad <br /> Mg MD '11(7031 <br /> 4.-once you have placed the lower mesh and levelled the care section inside the ditch, you <br /> should proceed with placing the anchors of the insertion section legs, see figure 1. Each leg <br /> must have 8 anchors type 1 on the upper lock spikes and anchors type 2 in the central lock <br /> spikes,each insertion section has 32 anchors type 1 and 32 anchors type 2.The extreme end of <br /> the anchors must be attached to the lower mesh as indicated in the details of the figure 15. <br /> Types of anchors: <br /> Insertion section S75R/16/22: <br /> Anchor type 1 Anchor type 2 <br /> B500S-DIAMETER 20 B500S-DIAMETER 20 <br /> 630 <br /> J s3o <br /> otX <br /> I / 1 <br /> 40,x/ 40 40 40 <br /> 40 40 <br /> iJ <br /> t <br /> INSERTION SECTION S75R/16/26&S75R/24/26: <br /> Anchor type 1 Anchor type 2 <br /> B500S-DIAMETER 20 B500S-DIAMETER 20 <br /> 830 <br /> /- <br /> 830 <br /> '11/ <br /> */:1‘ \ <br /> 40, 40 40 ,40 <br /> 40 40 40 40 <br /> Once you have fitted the anchors,proceed to the collocation of the upper mesh,according to <br /> the aforementioned specifications and to the figures 15 and 16. <br /> IMPORTANT-After all this process and before pouring the concrete,it is essential to revise <br /> the correct level of the insertion section. <br /> CHAPTER 5A-ERECTION WITH ANCHOR VERSION /q <br /> February 2015_Rev.0.1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.