Laserfiche WebLink
$ 1 I <br /> . ' aNgtir 3M©4'Il0[n�g MA N Mad <br /> Mg MD '11(7031 <br /> 4.-once you have placed the lower mesh and levelled the care section inside the ditch, you <br /> should proceed with placing the anchors of the insertion section legs, see figure 1. Each leg <br /> must have 8 anchors type 1 on the upper lock spikes and anchors type 2 in the central lock <br /> spikes,each insertion section has 32 anchors type 1 and 32 anchors type 2.The extreme end of <br /> the anchors must be attached to the lower mesh as indicated in the details of the figure 15. <br /> Types of anchors: <br /> Insertion section S75R/16/22: <br /> Anchor type 1 Anchor type 2 <br /> B500S-DIAMETER 20 B500S-DIAMETER 20 <br /> 630 <br /> J s3o <br /> otX <br /> I / 1 <br /> 40,x/ 40 40 40 <br /> 40 40 <br /> iJ <br /> t <br /> INSERTION SECTION S75R/16/26&S75R/24/26: <br /> Anchor type 1 Anchor type 2 <br /> B500S-DIAMETER 20 B500S-DIAMETER 20 <br /> 830 <br /> /- <br /> 830 <br /> '11/ <br /> */:1‘ \ <br /> 40, 40 40 ,40 <br /> 40 40 40 40 <br /> Once you have fitted the anchors,proceed to the collocation of the upper mesh,according to <br /> the aforementioned specifications and to the figures 15 and 16. <br /> IMPORTANT-After all this process and before pouring the concrete,it is essential to revise <br /> the correct level of the insertion section. <br /> CHAPTER 5A-ERECTION WITH ANCHOR VERSION /q <br /> February 2015_Rev.0.1 <br />