Laserfiche WebLink
• 'f <br /> 0 �_GIIDC'1111(DHN&°- Heli <br /> ILL © M, rfl©1 <br /> IMPORTANT-After all the procedure, and before pouring the concrete, is essential <br /> to verify again,the right level of the anchor even the earthing is properly done,and <br /> attached to the armor frame of the foundation pad. <br /> bill44004)00. <br /> tikootx '''; <br /> r <br /> « J <br /> !Olio. ' .41 * 4 <br /> ,. <br /> Ii'''': yr '' <br /> CD <br /> C) <br /> R <br /> } <br /> >' ' The dimensions to be respected from the layout, must assure the <br /> ' • free space amongst the anchor and the tower mast section, that <br /> a` <br /> allows tight and loosen the screws during the foundation procedure <br /> . ] and for dismantling the tower crane. <br /> , :, L- :::'.. <br /> • - <br /> •• <br /> ,. --,_ 1 <br /> ZZ CHAPTER 5A-ERECTION WITH ANCHOR VERSION <br /> February 2015_Rev.0.1 <br />