Laserfiche WebLink
I t , <br /> 411,g, Cog o 04 <br /> 6.-Pour the concrete till the height establishedin the figures 15 and 16, according to the type <br /> of insertion section to be installed, vibrate the concrete correctly. Once you have carried out <br /> the concrete pouring, dampen it for three days at least. We do not recommend the crane <br /> erection till the concrete foundation is not at least acquired 70%of its final resistance. <br /> AIt is very important that during all this process,you observe the condition of <br /> the section that there are no unexpected movements of this which could lead <br /> to unevenness in the levelling. <br /> - yam/ <br /> J <br /> " <br /> a <br /> , r , i , i , , 4* -„ , <br /> _� .-,"" <br /> x <br /> .zi <br /> 7.-Once the period for concrete hardening has lapsed,you proceed to dismantling of the jig <br /> clamp and erection of the crane. <br /> NOTE:SAEZ CRANES shall not be held responsible for the bad design of the concrete base as <br /> well as for the bad execution of the assembly of the insertion section. Any imperfects, <br /> damages or later work shall be attributed to the engineer responsible for the concrete base <br /> or works foreman who has carried out such work. <br /> CHAPTER 5A-ERECTION WITH ANCHOR VERSION <br /> February 2015_Rev.0.1 <br />