My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 7/22/2020
>
Contracts
>
Capital Contract
>
Interwest Construction Inc. 7/22/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2021 11:31:35 AM
Creation date
7/29/2020 8:59:51 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
7/22/2020
Council Approval Date
6/7/2020
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Sewer "O" Utility Upgrades
Public Works WO Number
UP3691
Tracking Number
0002362
Total Compensation
$4,234,567.89
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 6/21/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 6/23/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
688
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> cart <br /> EVERETT <br /> WASHiNGToN pUBL,C "MKS' <br /> I <br /> CITY OF EVERETT, WASHINGTON <br /> SPECIFICATIONS, PROPOSAL AND CONTRACT DOCUMENTS <br /> t <br /> FOR <br /> 1 <br /> I <br /> SEWER "0" UTILITY UPGRADES <br /> WORK ORDER # UP 3691 <br /> I <br /> ' April, 2020 <br /> Prepared By: <br /> City of Everett Public Works <br /> 3200 Cedar Street <br /> Everett, WA 98201 <br /> I <br /> 1 <br /> I <br /> I <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.