I <br /> CITY OF EVERETT SPECIAL PROVISIONS [Modified per Addendum #1] <br /> 3. The Contractor could not and did not use resources, including, but <br /> ' not limited to, labor, equipment, materials and tools, standing by or <br /> idled on this or other project for any Work during the period of Delay; <br /> 4. The Contractor's Overhead costs did not materially vary from its <br /> usual seasonal Overhead costs during the period of Delay; and <br /> 5. The Delay did not cause over absorbed Overhead in the period the <br /> delayed Work was completed. <br /> 1-09.11A(4)A1a Resources <br /> To demonstrate the Contractor could not and did not use resources, <br /> including, but not limited to, labor, equipment, materials and tools from <br /> this Project for any other work on this or any other project during the <br /> period of Delay in accordance with item 3 of 1-09.11A(4)A1 of these <br /> Special Provisions, the Contractor shall: <br /> II. Affirmatively represent and warrant that it did not perform <br /> substitute Work; <br /> 2. Identify the specific resources that were idled; and <br /> 3. Show that those resources did not, and could not, work on other <br /> contracts or projects during the Delay. <br /> 1-09.11 A(4)A1 b No Material Variations <br /> To demonstrate the Contractor's Overhead costs did not materially vary <br /> from its usual seasonal Overhead costs during the period of Delay in <br /> accordance with item 4 of 1-09.11A(4)A1 of these Special Provisions, the <br /> Contractor shall; <br /> 1. Affirmatively represent and warrant that the completion of the <br /> subject Work was extended and that such extension prevented <br /> the performance of other work during both the period of Delay <br /> and the later period of time required to complete the extended <br /> Work, <br /> 2. Disclose the details of Contractor generated billings and <br /> Contractor Overhead Costs, as defined in these Special <br /> Provisions, throughout the actual Project performance. The <br /> details of such information should be no less than specific <br /> identification of the sources and amounts of revenue on no <br /> greater than a monthly basis and specific identification of the <br /> types and amounts of Contractor Overhead Costs on no greater <br /> than a monthly basis for the actual Project duration. <br /> 1-09.11A(4)A1 c Overabsorbed Overhead <br /> To demonstrate that Contractor did not incur Overabsorbed Overhead in <br /> the period following the Delay, in accordance with item 5 of 1- <br /> 09.11A(4)A1. of these Special Provisions, the Contractor shall: <br /> 1. Affirmatively represent and warrant that completion of the <br /> delayed Work prevented the performance of other Work; <br /> 2. Identify the critical resource unavailable for other Work due to <br /> completion of the delayed Contract; and <br /> 3. Showing that unavailability of this critical resource precluded the <br /> performance of other Work. <br /> 1 <br /> Sewer 0 Division 1 —GENERAL REQUIREMENTS Addendum No. 1 <br /> WO No—UP3691 SP—133 May 2020 <br />