Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS [Modified per Addendum #1] <br /> this Contract, the Contractor shall, if requested by the Owner, furnish acceptable proof of a <br /> ' proper release from all such fees or claims. <br /> 1-10 TEMPORARY TRAFFIC CONTROL <br /> 1-10.1 General <br /> ' 1-10.1(2) Description <br /> Supplement 1-10.1(2) as follows: <br /> ' Provide a uniformed off-duty Police Officer to control traffic for work at signalized <br /> intersections and other critical situations as determined by the Engineer. <br /> 1-10.2 Traffic Control Management <br /> 1-10.2(1) General <br /> Delete the first sentence of the third paragraph of 1-10.2(1) and substitute the <br /> following: <br /> The primary and alternate TCS shall be certified as worksite traffic control <br /> supervisors by one of the organizations listed below: <br /> • Evergreen Safety Council (800) 521-0778 <br /> • Northwest Laborers Union (800) 240-9112 <br /> • American Traffic Safety Services Association (877) 642-4637 <br /> 1-10.2(2) Traffic Control Plans <br /> Delete the first paragraph of 1-10.2(2) and substitute the following: <br /> A traffic detour route and 3 lane closure plan for Colby Ave. are included in the <br /> Contract plans. In addition, the Contractor may use City's Standard Traffic Control <br /> Plans included in COE Standard Drawings, Series 700. The City does not <br /> represent or warrant that the Standard Plans are sufficient, adequate or complete <br /> for the Contractor's means, methods or plan of Work. If a new or additional Traffic <br /> Control Plan is necessary, prepare detailed Traffic Control Plan complying with <br /> COE Standard Drawings, Series 700, the MUTCD, Part 6, and the most current <br /> edition of the PROWAG (Public Rights-of-Way Accessibility Guidelines). Plan <br /> preparation shall be at Contractor's sole cost and submitted to the City for <br /> approval at least 14 calendar days before starting Work. Work may not begin until <br /> Contractor is in receipt of City approved Traffic Control Plan. <br /> 1-10.3 Traffic Control Labor, Procedures and Devices <br /> Delete 1-10.3 and substitute the following: <br /> 1-10.3 Flagging, Signs, and All Other Traffic Control Devices <br /> (******) <br /> 1-10.3(1) General <br /> The Contractor shall provide all flaggers, signs and other traffic control devices. The <br /> Contractor shall erect and maintain all construction signs, warning signs, detour signs, <br /> and other traffic control devices necessary to warn and protect the public at all times <br /> from injury or damage as a result of the Contractor's operations that may occur on <br /> highways, roads, or streets. No Work shall be done on or adjacent to the roadway until <br /> all necessary signs and traffic control devices are in place. <br /> Flaggers and spotters shall possess a current flagging card issued by the State of <br /> Washington, Oregon, or Idaho. The flagging card shall be immediately available and <br /> shown upon request by the City. <br /> ' Sewer 0 Division 1 —GENERAL REQUIREMENTS <br /> SP—137 Addendum No. 1 <br /> WO No—UP3691May 2020 <br />