My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 7/22/2020
>
Contracts
>
Capital Contract
>
Interwest Construction Inc. 7/22/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2021 11:31:35 AM
Creation date
7/29/2020 8:59:51 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
7/22/2020
Council Approval Date
6/7/2020
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Sewer "O" Utility Upgrades
Public Works WO Number
UP3691
Tracking Number
0002362
Total Compensation
$4,234,567.89
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 6/21/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 6/23/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
688
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' CITY OF EVERETT SPECIAL PROVISIONS [Modified per Addendum #1] <br /> permitted within the intersection. Each flagger shall control only one approach and be <br /> ' stationed near the stop bar. Provide a minimum of a series of three warning signs in <br /> advance of each flagger. Narrow multi-lane approaches to a single lane approaching <br /> the flagger. Provide and require all flaggers use two-way radios to signal each other to <br /> prevent conflicts and hold traffic when construction activities require. <br /> When the Bid proposed includes an item for "Traffic Control Labor," the Work covered <br /> by this item shall be for the labor actually used when authorized by the Engineer for: <br /> 1. The services of flaggers at both ends of a 2-way, single lane operation; or <br /> 2. The services of flaggers at signalized intersections if off-duty uniformed police <br /> officers are not available, or when otherwise specifically directed by the <br /> ' Engineer. <br /> The hours eligible for "Traffic Control Labor" shall be for the hours actually worked, <br /> plus 1 hour of on-site orientation per flagger. "Show-up time" will not be counted. The <br /> ' labor to perform the Work described in the item "Maintenance and Protection of Traffic <br /> Control" is specifically excluded from this Work. No adjustment will be made to the unit <br /> price for"Traffic Control Labor"for overtime or holiday hours worked. <br /> 1-10.3(4)A Traffic Control -Off-Duty Police Officer <br /> Provide off-duty uniformed Police Officer for traffic control at all signalized <br /> intersections. Acceptable sources for off-duty uniformed Police Officers are as <br /> follows in order of preference: <br /> 1. City of Everett Police Department, contact either, <br /> a. Officer Mike Bernardi, (425) 327-9119 <br /> b. Officer Mike Drake, (425) 244-0025 <br /> 2. Puget Sound Executive Service, 625 B 5th Ave, Ste 4, Sequim, WA <br /> 98382 <br /> a. Contact Nick Janssen, (360) 681-7737 <br /> 1-10.3(5) Construction Signs <br /> All signs required by the approved traffic control plan(s) as well as any other <br /> appropriate signs prescribed by the Engineer will be furnished by the Contractor and <br /> be paid under the item "Maintenance and Protection of Traffic Control." The Contractor <br /> ' shall erect them on posts or supports and maintain them in a clean, neat, and <br /> presentable condition until the necessity for them has ceased. All non-applicable signs <br /> shall be removed or covered with either metal or plywood during periods when they are <br /> not needed. When the need for any of these signs has ceased, the Contractor, upon <br /> approval of the Engineer, shall take down these signs, posts, or supports. All signs, <br /> posts, and supports shall be removed from the project and shall remain the property of <br /> the Contractor. <br /> ' There shall be no separate classification of signs. All construction signs, whether used <br /> throughout the construction, during a major phase of construction or removed daily <br /> shall be paid under the item "Maintenance and Protection of Traffic Control." Portable <br /> or temporary mountings may require added weight for stability. If it is necessary to add <br /> weight to the signs, only a bag of sand that will rupture on impact shall be used. The <br /> bag of sand shall have a maximum weight of 40 pounds and shall be suspended no <br /> ' more than 1-foot from the ground. <br /> The Work to provide the construction signing shall be: <br /> 1. Furnishing all construction signs. <br /> 2. Furnishing, removing, and disposing of the posts or supports for the signs. <br /> 3. Initial installation and subsequent removal of all construction signs. <br /> ' Sewer 0 Division 1 —GENERAL REQUIREMENTS Addendum No. 1 <br /> WO No—UP3691 SP—139 May 2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.