Laserfiche WebLink
I <br /> I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> Table of Contents <br /> ITable of Contents I <br /> ADVERTISEMENT FOR BIDS 1 <br /> IDIVISION B - BID ITEM DESCRIPTIONS 3 <br /> DIVISION P - PROPOSAL 21 <br /> IBID SCHEDULE 23 <br /> PROPOSAL SIGNATURE SHEET 29 <br /> SUBCONTRACTORS FORM 30 <br /> I DISADVANTAGED/WOMEN'S BUSINESS ENTERPRISE 31 <br /> NON-COLLUSION AFFIDAVIT 32 <br /> BID DEPOSIT 33 <br /> IBID BOND 33 <br /> DIVISION C - CONTRACT 37 <br /> IPAYMENT BOND 41 <br /> PERFORMANCE BOND 43 <br /> DIVISION 1 -GENERAL REQUIREMENTS 45 <br /> I General Description and Location of Project (******) 45 <br /> Design Engineer (******) 45 <br /> Standard Specifications (******) 45 <br /> I1-01 DEFINITIONS AND TERMS 45 <br /> 1-01.3 Definitions 56 <br /> 1-02 BID PROCEDURES AND CONDITIONS 50 <br /> I <br /> 1-02.1 Prequalifications of Bidders 50 <br /> 1-02.1 Bidder Responsibility Criteria (******) 50 <br /> 1-02.2 Plans and Specifications 51 <br /> I1-02.4 Examination of Plans, Specifications, and Site of Work 51 <br /> 1-02.5 Proposal Form 52 <br /> I 1-02.6 Preparation of Proposal 53 <br /> 1-02.7 Bid Deposit 53 <br /> 1-02.8 Noncollusion Declaration and Lobbying Certification 54 <br /> I 1-02.9 Delivery of Proposal 54 <br /> 1-02.10 Withdrawing, Revising, or Supplementing Proposal 54 <br /> 1-02.12 Public Opening of Proposals 55 <br /> I 1-02.13 Irregular Proposals 55 <br /> 1-02.14 Disqualification of Bidders 55 <br /> 1-02.15 Pre-Award Information 56 <br /> I 1-03 AWARD AND EXECUTION OF CONTRACT 56 <br /> 1-03.1 Consideration of Bids 56 <br /> Sewer 0 Table of Contents- April,2020 <br /> IWO No.—UP3691 SP-i <br /> I <br />