My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 7/22/2020
>
Contracts
>
Capital Contract
>
Interwest Construction Inc. 7/22/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2021 11:31:35 AM
Creation date
7/29/2020 8:59:51 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
7/22/2020
Council Approval Date
6/7/2020
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Sewer "O" Utility Upgrades
Public Works WO Number
UP3691
Tracking Number
0002362
Total Compensation
$4,234,567.89
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 6/21/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 6/23/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
688
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS I <br /> 1-03.2 Award of Contract 57 <br /> 1-03.3 Execution of Contract 57 I <br /> 1-03.4 Contract Bond 57 <br /> 1-03.5 Failure to Execute Contract 58 <br /> 1-03.6 Return of Bid Deposit 58 I <br /> 1-03.7 Judicial Review 58 <br /> 1-04 SCOPE OF THE WORK 58 <br /> 1-04.1 Intent of the Contract 58 I <br /> 1-04.2 Coordination of Contract Documents, Plans, Special Provisions Specifications, and Addenda 59 <br /> 1-04.3 Reference Information 60 <br /> 1-04.4 Changes 60 I <br /> 1-04.5 Procedure and Protest by the Contractor 62 <br /> 1-04.5 Notice by Contractor (******) 62I <br /> 1-04.6 Variation in Estimated Quantities 63 <br /> 1-04.7 Differing Site Conditions (Changed Conditions) 64 <br /> 1-05 CONTROL OF WORK 64 I <br /> 1-05.1 Authority of the Engineer 64 <br /> 1-05.1 City (******) 64 <br /> 1-05.2 Authority of Assistants and Inspectors 65 I <br /> 1-05.2 City's Representative (******) 65 <br /> 1-05.3 Working Drawings 66 <br /> 1-05.4 Conformity With and Deviations From Plans and Stakes 68 I <br /> 1-05.6 Inspection of Work and Materials 70 <br /> 1-05.7 Removal of Defective and Unauthorized Work 71 <br /> 1-05.10 Guarantees 72 I <br /> 1-05.11 Final Inspection 72 <br /> 1-05.11 Final Inspections and Operational Testing (******) 72 <br /> 1-05.12 Final Acceptance 74 I <br /> 1-05.13 Superintendents, Labor and Equipment of Contractor 74 <br /> 1-05.14 Cooperation With Other Contractors 74 <br /> 1-05.16 Water and Power (******) 75 I <br /> 1-05.17 Oral Agreements (******) 76 <br /> 1-05.18 Contractor (******) 76 <br /> 1-05.19 City-Contractor Coordination (******) 78 I <br /> 1-06 CONTROL OF MATERIAL 79 <br /> 1-06.1 Approval of Materials Prior to Use 80 <br /> 1-06.2 Acceptance of Materials 80 I <br /> 1-06.3 Manufacturer's Certificate of Compliance 80 <br /> 1-06.4 Handling and Storing Materials 81 <br /> 1-06.6 Recycled Materials 81 I <br /> 1-07 LEGAL RELATIONS AND RESPONSIBILITIES TO THE PUBLIC 81 <br /> 1-07.1 Laws to be Observed 81 I <br /> 1-07.2 State Taxes 83 <br /> 1-07.2 State Sales Tax 83 <br /> Sewer 0 Table of Contents- April,2020 I <br /> WO No.-UP3691 SP-ii <br />
The URL can be used to link to this page
Your browser does not support the video tag.