My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 7/22/2020
>
Contracts
>
Capital Contract
>
Interwest Construction Inc. 7/22/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2021 11:31:35 AM
Creation date
7/29/2020 8:59:51 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
7/22/2020
Council Approval Date
6/7/2020
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Sewer "O" Utility Upgrades
Public Works WO Number
UP3691
Tracking Number
0002362
Total Compensation
$4,234,567.89
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 6/21/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 6/23/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
688
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS 111 <br /> 8-05.4 Measurement 215 <br /> 8-05.5 Payment 215 I <br /> 8-06 CEMENT CONCRETE DRIVEWAY ENTRANCES 215 <br /> 8-06.1 Description 215 111 <br /> 8-06.2 Materials 215 <br /> 8-06.3 Construction Requirements 215 <br /> 8-06.4 Measurement 216 I <br /> 8-06.5 Payment 216 <br /> 8-13 SURVEY MONUMENTS AND CASES (******) 216 <br /> 8-13.1 Description 216 I <br /> 8-13.2 Materials 216 <br /> 8-13.3 Construction Requirements 216 <br /> 8-13.4 Measurement 217 <br /> 8-13.5 Payment 217 <br /> 8-14 CEMENT CONCRETE SIDEWALKS 217 <br /> 8-14.2 Materials 217 <br /> 8-14.3 Construction Requirements 217 <br /> 8-14.4 Measurement 219 <br /> 8-14.5 Payment 219 <br /> 8-20 ILLUMINATION, TRAFFIC SIGNAL SYSTEMS, INTELLIGENT TRANSPORTATION <br /> SYSTEMS AND ELECTRICAL 219 <br /> 8-20.2 Materials 219 <br /> 8-20.3 Construction Requirements 228 <br /> 8-20.4 Measurement 234 I <br /> 8-20.5 Payment 234 <br /> 8-21 PERMANENT SIGNING 235 <br /> 8-21.1 Description 235 <br /> 8-21.3 Construction Requirements 235 <br /> 8-21.4 Measurement 235 <br /> 8-21.5 Payment 235 I <br /> 8-22 PAVEMENT MARKING 235 <br /> 8-22.2 Materials 235 <br /> 8-22.3 Construction Requirements 235 I <br /> 8-22.4 Measurement 236 <br /> 8-22.5 Payment 236 <br /> DIVISION 9- MATERIALS 237 , <br /> 9-03 AGGREGATES 237 <br /> 9-03.6 Vacant 237 <br /> 9-03.6 Aggregates for Asphalt Treated Base (ATB) 237 <br /> 9-03.22 Sand Backfill for Pipe Zone(******) 238 <br /> 9-03.23 Class 1 Stone for Pipe Zone Backfill and Bedding (******) 238 I <br /> 9-03.24 Bedding Sand for Interlocking Pavers (******) 238 <br /> Sewer 0 Table of Contents - April,2020 <br /> WO No.-UP3691 SP-viii <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.