My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 7/22/2020
>
Contracts
>
Capital Contract
>
Interwest Construction Inc. 7/22/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2021 11:31:35 AM
Creation date
7/29/2020 8:59:51 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
7/22/2020
Council Approval Date
6/7/2020
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Sewer "O" Utility Upgrades
Public Works WO Number
UP3691
Tracking Number
0002362
Total Compensation
$4,234,567.89
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 6/21/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 6/23/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
688
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> I <br /> 9-03.25 Joint Sand for Interlocking Pavers(******) 238 <br /> I 9-04 JOINTS AND CRACK SEALING MATERIALS 239 <br /> 9-04.12 Watertight Pipe to Manhole Connection Boot 239 <br /> 9-04.13 Flexible Coupling 239 <br /> I9-05 DRAINAGE STRUCTURES, CULVERTS,AND CONDUITS 239 <br /> 9-05.12 Polyvinyl Chloride (PVC) Pipe 239 <br /> I 9-05.13 Ductile Iron Sewer Pipe 239 <br /> 9-05.15 Metal Castings 239 <br /> 9-05.24 Polypropylene Sewer Pipe 240 <br /> I9-05.30 Stainless Steel Clamp 240 <br /> 9-05.32 Insertion Tee 240 <br /> 9-05.62 Synthetic Rubber Sleeve Seal 240 <br /> I9-05.64 Polypropylene Manhole and Hand Hold Steps 240 <br /> 9-05.66 Polypropylene Manhole Ladder 240 <br /> 9-12 MASONRY UNITS 241 <br /> 9-12.3 Concrete Interlocking Pavers 241 <br /> 9-14 EROSION CONTROLAND ROADSIDE PLANTING 241 <br /> I 9-14.1 Soils 241 <br /> 9-14.2 Seed 243 <br /> 9-14.3 Fertilizer 243 <br /> I 9-14.4 Mulch and Amendments 244 <br /> 9-14.6 Plant Materials 244 <br /> 9-23 CONCRETE CURING MATERIALS AND ADMIXTURES 244 <br /> I 9-23.2 Liquid Membrane-Forming Concrete Curing Compounds 244 <br /> 9-23.6 Chemical Admixtures for Concrete 244 <br /> 9-30 WATER DISTRIBUTION MATERIALS 245 <br /> I 9-30.1 Pipe 245 <br /> 9-30.3 Valves 245 <br /> 9-30.5 Hydrants 246 <br /> 1 9-30.6 Water Service Connections (2-inches and Smaller) 246 <br /> APPENDIX A— GEOTECHNICAL INVESTIGATION AND BORING LOGS <br /> IAPPENDIX B —COE STANDARD DRAWINGS <br /> APPENDIX C —CHANGE ORDER FORMS <br /> I APPENDIX D— PUGET SOUND CLEAN AIR AGENCY— EXCERPTS OF AIR QUALITY <br /> RULES <br /> APPENDIX E— NOISE VARIANCE AND ORDINANCE <br /> IAPPENDIX F —WSDOT STANDARD PLANS <br /> I <br /> ISewer 0 Table of Contents - April,2020 <br /> WO No.—UP3691 SP-ix <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.