<br /> CITY OF EVERETT SPECIAL PROVISIONS
<br /> IDIVISION B - BID ITEM DESCRIPTIONS
<br /> I Bid Item 1 &61: Mobilization
<br /> Measurement and Payment: Lump Sum (LS)
<br /> The lump sum bid for mobilization shall constitute complete compensation for all of
<br /> I Contractor's preconstruction costs of preparatory work and operations including, but not
<br /> limited to, those necessary for the movement of his personnel, equipment, supplies and
<br /> incidentals to the Project; for the establishment of his offices, buildings and other facilities
<br /> necessary for Work on this Project; for premiums on bonds and insurance for the Project,
<br /> Iand for Work and operations that he must perform or costs he must incur before beginning
<br /> production work on the various items on the Project. Mobilization also includes, but is not
<br /> limited to, posting construction identification signs, securing permits, establishing safety and
<br /> I security measures, preparing a traffic control plan(s), preconstruction photographs,
<br /> developing a Schedule of Values for lump sum bid items, submitting the project schedule and
<br /> providing product and material submittals. Also include mobilization costs for all
<br /> I subcontracted work along with all costs for utility coordination noted on the Plans and in the
<br /> Specifications.
<br /> Items not included in this item include, but are not limited to:
<br /> I (a) Work covered by a specific bid item or Work that is to be included in a bid item
<br /> or items.
<br /> (b) Profit, interest on borrowed money, overhead or management costs.
<br /> 1 Partial payments will be made for the lump sum contract price for"Mobilization" as follows:
<br /> (a) When 5% of the total original contract amount is earned from other bid items,
<br /> 50% of the amount bid for mobilization, or 5% of the total original contract
<br /> I amount, whichever is the least, will be paid.
<br /> (b) When 10% of the total original contract amount is earned from other bid items.
<br /> 100% of the amount bid for mobilization, or 10% of the total contract amount,
<br /> whichever is the least, will be paid.
<br /> IUpon completion of all work on the project, payment of any amount bid for mobilization in
<br /> excess of 10% of the total original contract amount will be paid.
<br /> I Bid Item 2 &62: Surveying
<br /> Measurement and Payment: Lump Sum (LS)
<br /> Measurement for surveying will be the ratio of actual pipe installed and backfilled to the total
<br /> I quantity of pipe listed in the Proposal.
<br /> The lump sum bid for surveying includes, but is not limited to, all costs associated with
<br /> furnishing all labor, tools, survey instruments materials, and other equipment necessary for
<br /> the setting and monitoring the location, elevation, alignment and grade of the Work as
<br /> I specified in 1-05.4 CONFORMITY WITH AND DEVIATIONS FROM PLANS AND STAKES
<br /> and the Plans.
<br /> I
<br /> The lump sum bid item also includes, but is not limited to, all costs associated with furnishing
<br /> all labor,tools, survey instruments, materials and other equipment necessary for verifying the
<br /> rim and invert elevations, prior to construction, of all existing manholes and pipes where
<br /> connections are to be made.
<br /> I The lump sum also includes, but is not limited to, all costs associated with furnishing all labor,
<br /> tools, survey instruments, materials and other equipment necessary for obtaining the "as
<br /> constructed" location and elevations of the Work, in particular, sewer pipe invert elevations
<br /> land other information necessary for production of the Record Drawing (As-Constructed)
<br /> documents meeting the requirements defined in RECORD DRAWINGS of these Special
<br /> Provisions.
<br /> I Sewer 0 Division B-BID DESCRIPTIONS April,2020
<br /> WO No.-UP3691 SP-3
<br /> I