<br /> CITY OF EVERETT SPECIAL PROVISIONS
<br /> 2, 7, and 8 of the Standard Specifications and these Special Provisions. Payment per lump
<br /> sum includes all equipment, materials, labor, installation, and removal, and all other work
<br /> ' required to meet the trench excavation and safety system requirements.
<br /> Bid Item 8 &68: Street Cleaning and Sweeping
<br /> Measurement and Payment: Unit Price per Hour(HR)
<br /> The unit price per hour for Street Cleaning & Sweeping shall be full compensation for all
<br /> labor, tools, incidentals, and equipment necessary to provide the street sweeping, cleaning,
<br /> and dust control water required for this project.
<br /> Measurement for street sweeping and cleaning will be by the hour for the actual time
<br /> consumed in pavement sweeping, cleaning and debris removal. No allowance will be made
<br /> for time consumed in making repairs to the equipment or for moving the equipment to or from
<br /> the site on which the street cleaning is ordered. No separate payment will be made for water
<br /> required for dust control and the normal operation of the pickup sweepers.
<br /> Bid Item 9&69: Erosion/Water Pollution Control
<br /> Measurement and Payment: Force Account (FA)
<br /> This Force Account bid item shall be accomplished in accordance with 1-09.6 FORCE
<br /> ACCOUNT; except, as modified below.
<br /> Erosion/Water Pollution Control, Force Account, shall constitute full compensation for all
<br /> labor, materials, tools and equipment necessary and incidental for the installation,
<br /> maintenance and removal of the temporary erosion and sedimentation control (TESC)
<br /> facilities to prevent pollution, erosion, siltation, and damage to any wetland, stream, other
<br /> watercourse, or surrounding property throughout the life of the Contract. TESC facilities shall
<br /> include, but not be limited to, any cover measures, runoff control measures, soil and site
<br /> ' stabilization measures, silt fencing as shown on the Plans, and inlet protection measures for
<br /> the work area and downstream areas.
<br /> The TESC measures shall limit the erosion possibility by covering disturbed soils, preventing
<br /> sloughing or raveling of cut and natural slopes, and controlling surface runoff from flowing
<br /> into excavations using measures such as curbs, berms, dikes, rock-lined ditches, and other
<br /> approved measures. Filter fabric fence shall be used to treat small areas of non-concentrated
<br /> runoff prior to discharge from the site.
<br /> Bid Item 10 & 70: Sawcut Existing Improvements
<br /> Measurement and Payment: Unit Price per Linear Foot (LF)
<br /> Measurement for saw-cutting will be per linear foot along the true length of the surface cut.
<br /> The unit price per lineal foot for the final saw-cutting of asphalt, concrete, steel rail, wood tie,
<br /> roadway debris material, or any combination of materials thereof, regardless of depth or
<br /> location of materials, shall be full compensation for all labor, material, tools, and equipment
<br /> necessary to satisfactorily complete the Work as specified in Section 2-02.3(3) of the
<br /> Standard Specifications, these Special Provisions and as shown on the Plans. The unit price
<br /> per lineal foot for saw-cutting includes, but is not limited to,the saw-cutting necessary for the
<br /> final joint between existing improvements and permanent HMA pavement.
<br /> Include cost of cleanup by vacuum collection and disposal of the cuttings slurry with this bid
<br /> ' item as there will be no separate payment for cleanup. Any necessary re-cutting due to
<br /> damage during excavation will not be remeasured for payment.
<br /> Bid Item 11 & 71: Bid Item 12 &62: Sawcut Cement Concrete Curb & Gutter& Sidewalk
<br /> ' Measurement and Payment: Unit Price per Linear Foot (LF)
<br /> Measurement for saw-cutting will be per linear foot along the true length of the surface cut.
<br /> ' Sewer 0 Division B-BID DESCRIPTIONS April,2020
<br /> WO No.-UP3691 SP-5
<br /> I