Laserfiche WebLink
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> IMeasurement for crushed surfacing base course will be by the ton as recorded on certified <br /> weight tickets in accordance with 1-09.2 WEIGHING EQUIPMENT and limited to dimensions <br /> defined in the Work, descriptions for other bid items, shown on the Plans, details or COE <br /> I Standard Drawings or as otherwise approved by the Engineer. In addition to surfacing, this <br /> product will be paid by the ton for sewer and storm pipe bedding. Crushed Surfacing Base <br /> Course material placed exceeding "neatline" quantities without advance authorization by the <br /> I Inspector will not be paid for. <br /> The unit price per ton shall be full compensation for all labor, compaction, material,tools, and <br /> equipment necessary to furnish, haul, stockpile, place,grade,and compact imported crushed <br /> I surfacing base course for the Work as required, from a Contractor supplied source in <br /> accordance with the Standard Specifications and these Special Provisions. <br /> Where Class 1 Stone for Pipe zone backfill and bedding is substituted for crushed surfacing <br /> I base course, where allowed in the plans, all costs for providing Class 1 Stone in accordance <br /> with Special Provision Section 9-03.23, shall be included in this bid item. <br /> The unit price for crushed surfacing base course also includes all costs for controlling <br /> I moisture content and all costs for dewatering. <br /> Also included in this bid item shall be the cost of all equipment required to remove existing <br /> soils to attain proper elevations, compaction of native subgrade soils, as well as to uniformly <br /> I spread and compact the crushed surfacing material. <br /> The unit price for this bid item includes all costs for removing, loading and disposing of <br /> displaced unsuitable material, including haul. <br /> I Include in this bid item the cost of sprinkling during dry periods prior to placement of the <br /> crushed surfacing and while spreading and compacting the material. <br /> Payment for crushed surfacing base course will be by the ton of material placed and <br /> I approved by the Inspector. <br /> Bid Item 15 & 75: Gravel Borrow <br /> Measurement and Payment: Unit Price per Ton (TON) <br /> 1 Measurement for Gravel Borrow shall be by the ton, recorded on certified weight tickets in <br /> accordance with 1-09.2 WEIGHING EQUIPMENT, and placed within the limits of dimensions <br /> defined in the Work, descriptions for other bid items, shown on the Plans, or COE Standard <br /> I Drawings, or as otherwise approved by the Engineer. <br /> Measurement for gravel borrow shall be limited to maximum trench widths defined in the work <br /> descriptions for other bid items. <br /> 1 The unit price per ton, based on certified weight tickets, for gravel borrow shall be full <br /> compensation for all labor, material, tools and equipment necessary to furnish imported <br /> gravel borrow for trench backfill where Engineer has determined native soils are not suitable <br /> I for backfill, and other Work as required, from a Contractor-supplied source in accordance <br /> with 2-03.3(14)J of the Standard Specifications and these Special Provisions. <br /> The unit price for gravel borrow shall include all costs of furnishing, hauling, stockpiling, <br /> I placing, grading and compacting the material in place. <br /> The unit price for this bid item includes all costs for removing, loading and disposing of <br /> displaced unsuitable material, including haul. <br /> IBid Item 16 & 76: Controlled Density Fill <br /> Measurement and Payment: Cubic Yard (CY) <br /> The unit price per cubic yard for controlled density fill shall be full compensation for all labor, <br /> material, incidentals, tools and equipment necessary to furnish, deliver, and place controlled <br /> density fill as required, from a Contractor-supplied source in accordance with the Standard <br /> Specifications, Special Provisions and Contract Plans. <br /> I Sewer 0 Division B—BID DESCRIPTIONS April,2020 <br /> WONo.—UP3691 SP-7 <br /> I <br />