Interwest Construction Inc. 7/22/2020
>
Contracts
>
Capital Contract
>
Interwest Construction Inc. 7/22/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2021 11:31:35 AM
Creation date
7/29/2020 8:59:51 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
7/22/2020
Council Approval Date
6/7/2020
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Sewer "O" Utility Upgrades
Public Works WO Number
UP3691
Tracking Number
0002362
Total Compensation
$4,234,567.89
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 6/21/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 6/23/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
688
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> Measurement for controlled density fill will be measured by the cubic yard for the quantity of I <br /> material placed per the producer's invoice within limits of dimensions defined in the Work, <br /> descriptions of other bid items, shown on the Plans, details or COE Standard Drawings or as <br /> otherwise approved by the Engineer. I <br /> Bid Item 17 & 77: Temporary Roadway Patch <br /> Measurement and Payment: Lump Sum (LS) <br /> No measurement will be made for the lump sum item Temporary Roadway Patch. <br /> Payment for the lump sum item Temporary Roadway Patch shall be a one-time lump sum <br /> regardless of how many times Temporary Roadway Patch is placed, removed, replaced, or I <br /> relocated. The lump sum price shall be full compensation for all labor, material, tools and <br /> equipment necessary to satisfactorily complete the Work as defined in the Standard <br /> Specifications, 5-06.3(6) of these Special Provisions and as shown on the Plans. <br /> Bid Item 18: Combined Sewer Pipe, 8-inch I <br /> Bid Item 19: Combined Sewer Pipe, 10-inch <br /> Bid Item 20: Combined Sewer Pipe, 12-inch I <br /> Bid Item 21: Combined Sewer Pipe, 18-inch <br /> Bid Item 22: Combined Sewer Pipe, 24-inch <br /> Measurement and Payment: Unit Price per Linear Foot (LF) <br /> The unit price per linear foot bid for the type and size of combined sewer pipe shall be full <br /> compensation for all labor, material, incidentals, tools and equipment necessary to I <br /> satisfactorily complete the work as defined in these Contract Documents. <br /> The unit price per linear foot of combined sewer pipe shall be full compensation for furnishing, <br /> hauling, and assembling in place the completed installation, including all wyes, tees, special I <br /> fittings, joint materials and adjustment of inverts to manholes for the completion of the <br /> installation to the required lines and grades. <br /> The unit price of combined sewer pipe shall also include, but not be limited to; all costs for III <br /> trench excavation; hauling and disposing of surplus material; dewatering; sewer flow <br /> bypassing; furnishing, stockpiling, hauling and placing and compacting suitable native <br /> backfill; cleaning and flushing pipes and existing structures;testing and inspecting pipe; pipe <br /> separation pads, connecting pipe to and rechanneling of existing structures; reconnecting <br /> existing sanitary sewer; and replacing, protecting and maintaining utilities. <br /> All costs associated with jointing dissimilar types of sewer pipe with a coupling or adapter <br /> shall be included in the unit price for this bid item. <br /> Furnishing, hauling and placing of crushed surface base course for pipe zone bedding shall <br /> be paid under"Crushed Surfacing Base Course". Furnishing, hauling and placing of import <br /> trench backfill (Gravel Borrow) shall be paid under"Gravel Borrow". <br /> The costs for potholing and excavation required to determine exact depths and locations of <br /> other utilities shall be considered as incidental to the work and these costs shall be included <br /> in the unit contract price. I <br /> Measurement will be based on actual horizontal length of the combined sewer pipe <br /> constructed and will include the length of the nearest foot, through manholes and wyes. <br /> Bid Item 23: Combined Sewer Manhole, Type 1, 48-inch DIA. <br /> Bid Item 24: Combined Sewer Manhole, Type 3, 48-inch DIA. <br /> Bid Item 25: Combined Sewer Manhole, Type 3, 60-inch DIA. I <br /> Measurement and Payment: Unit Price per Each (EA) <br /> Sewer 0 Division B—BID DESCRIPTIONS April,2020 I <br /> WO No.—UP3691 SP-8 <br /> I <br />