My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 7/22/2020
>
Contracts
>
Capital Contract
>
Interwest Construction Inc. 7/22/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2021 11:31:35 AM
Creation date
7/29/2020 8:59:51 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
7/22/2020
Council Approval Date
6/7/2020
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Sewer "O" Utility Upgrades
Public Works WO Number
UP3691
Tracking Number
0002362
Total Compensation
$4,234,567.89
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 6/21/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 6/23/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
688
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> Measurement and Payment: Unit Price per Each (EA) , <br /> Plastic Traffic Arrow removal will be measured by each plastic arrow removed. The unit Contract <br /> price shall be full payment for all costs to perform the Work as described in Section 8-22. <br /> Bid Item 57: Plastic Line <br /> Measurement and Payment: Unit Price per Linear Foot (LF) <br /> Plastic Line will be measured by the linear foot of plastic line installed. The unit Contract price <br /> shall be full payment for all costs to perform the Work as described in Section 8-22. <br /> Bid Item 58: Plastic Wide Line <br /> Measurement and Payment: Unit Price per Linear Foot(LF) <br /> Plastic Wide Line will be measured by the linear foot of plastic wide line installed.The unit Contract <br /> price shall be full payment for all costs to perform the Work as described in Section 8-22. <br /> Bid Item 59: Illumination System 1 <br /> Measurement and Payment: Lump Sum (LS) <br /> The unit Contract price shall be full payment for all costs to perform the Work as shown in the <br /> plans and described in Section 8-20. All costs associated with adjusting junction boxes to grade <br /> including excavation, backfill, and restoration of adjacent areas in a manner acceptable to the <br /> ENGINEER, shall be included in the associated illumination system bid item. <br /> All costs associated with the installation of the communication system, including conduit, vaults, <br /> excavation, backfill, detection tape, and all labor and materials which are required to complete <br /> the communication system shall be included in the lump sum Contract price for the illumination <br /> system. <br /> Bid Item 60 & 103: Force Account <br /> Measurement and Payment: Force Account (FA) <br /> This Force Account bid item shall be accomplished in accordance with 1-09.6 FORCE <br /> ACCOUNT; except, as modified below. <br /> The Force Account bid item has been included for specific miscellaneous work items listed <br /> below and for any additional work directed by the Engineer that is not required by the original <br /> Contract and to address changed conditions or unanticipated work. The amount indicated in <br /> the Proposal for this bid item is to provide a common bid amount. The actual amount paid <br /> under this bid item may vary from no payment to the full amount of the bid item. Work <br /> performed under this bid item will be initiated with a work directive issued by the Engineer. <br /> In lieu of the preceding prescribed method of determining payment for Force Account work, <br /> payment may be made at unit prices or lump sum prices agreed to by the Engineer and the <br /> Contractor prior to beginning the Force Account work. <br /> The following miscellaneous construction work will be paid for by Force Account as specified <br /> in 1-09.6 FORCE ACCOUNT. For the purpose of providing a common Proposal for all <br /> Bidders, and for that purpose only, the City has estimated an amount and included it in the <br /> bid item for Force Account work to become part of the total Bid by the Contractor. <br /> (a) Repair or replace existing water service pipes beyond the limits indicated on the , <br /> Plans. <br /> (b) Repair or replace storm or sanitary side sewer pipes beyond the limits indicated <br /> on the Plans. <br /> (c) Restoration of existing special private improvements including, but not limited to, <br /> brick or stone walkways, decorative concrete walks or driveways, concrete <br /> masonry or stone walls, rockery's, fences, landscape plantings, including but not <br /> limited to, hedges, trees, flowerbeds, bark, mulch, irrigation systems, yard <br /> lighting, rockeries, retaining walls, or steps. <br /> Sewer 0 Division B—BID DESCRIPTIONS April,2020 <br /> WO No.—UP3691 SP-16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.