Laserfiche WebLink
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> IBid Item 78: Ductile Iron Pipe for Watermain, 6-Inch Diam. <br /> Bid Item 79: Ductile Iron Pipe for Watermain, 8-Inch Diam. <br /> I <br /> Bid Item 80: Ductile Iron Pipe for Watermain, 14-Inch Diam. <br /> Measurement and Payment: Unit Price per Linear Foot(LF) <br /> Per linear foot pipe measurement shall be based on the slope distance from point to point. <br /> I <br /> The point of beginning or ending of measurement in any particular run of pipe shall be the <br /> vertical intersection of the centerline of the pipe measured with the centerline of the <br /> intersection pipe, or with the beginning or ending of any new linear length of valves or <br /> I <br /> couplings contained within the measured length. At changes in pipe size connected by a <br /> reducer, the point of measurement shall be taken as the midpoint of the reducer. <br /> The unit contract price for Ductile Iron Pipe For Watermain, -Inch Diam., shall constitute <br /> I <br /> full compensation for all labor, materials,tools and equipment necessary to furnish and install <br /> the pipe, restrained joints (where shown on the Plans or as required by the Standard <br /> Specifications and Special Provisions), and all fittings, including tees, crosses, reducers, <br /> I <br /> couplings, and sleeves required for complete installation along the run of each pipe size, as <br /> shown on the Plans and specified herein, and additionally, shall include, but not be limited <br /> to, the following: <br /> 1 <br /> 1. Removal of structures or obstructions not specifically covered under other Bid Items. <br /> This shall include, but not be limited to, thrust blocks, miscellaneous landscaping, and <br /> sod as indicated on the Plans. Removal of existing water line to allow for installation of <br /> new water line. <br /> I <br /> 2. All required potholing to verify locations of water service crossings and existing utilities. <br /> The costs for pot-holing and excavation required to determine exact depths and <br /> locations of other utilities shall be included with this Work with no direct compensation <br /> I made. <br /> 3. Utility or light pole holding in conformance with the requirements of the applicable utility <br /> including, if necessary, arranging for the utility to hold poles and paying the associated <br /> fees. <br /> I <br /> 4. Trench excavation and dewatering, installation of pipe, furnishing, placing and <br /> compacting sand backfill for pipe bedding, furnishing, placing and compacting suitable <br /> native material for trench backfill and placing and compacting imported backfill material. <br /> I <br /> No extra payment shall be made for removing, loading, hauling, and disposing of <br /> displaced and unsuitable material. <br /> 5. Maintenance, restoration and/or relocation, if required, of existing culverts, storm <br /> I drainage pipe, other utilities and structures affected by construction that are to remain. <br /> 6. Temporary and permanent thrust blocking and dead man blocks, and temporary and <br /> permanent restraint systems. <br /> 7. Ethafoam pads or sand backfill between watermain and other pipes. <br /> I8. Maintenance of existing watermain and provisions for interim water service. <br /> Coordination with COE Water Department for use of temporary water main pipe during <br /> construction to provide temporary water service. All labor, materials and equipment <br /> I <br /> needed to provide temporary water service shall be included in this Work with no direct <br /> compensation made. <br /> 9. Pressure and purity testing of all watermains and shall include providing temporary blow- <br /> ' offs, backflow prevention, air gap apparatus, flushing, and disinfecting as necessary for <br /> testing in accordance with 7-09.3(24) of these Special Provisions and COE Standard <br /> Drawing No. 526. <br /> 10. Extra depth, including excavation, backfill and compaction required to clear known <br /> Iburied utilities or other known obstacles. <br /> 11. Abandonment of existing watermains as shown on the Plans, including cutting, draining <br /> water and properly disposing, and plugging pipe at each end with a minimum of 2-feet <br /> I <br /> Sewer 0 WO No.-UP3691 Division B-BID DESCRIPTIONS <br /> SP-17 April,2020 <br />