Laserfiche WebLink
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> Measurement and Payment: Unit Price per Each (EA) I <br /> The unit contract price for Connect to Fire Service, -Inch, shall constitute full compensation <br /> for all labor, materials, tools and equipment necessary to connect new -inch ductile iron I <br /> fire service lines from the tee on the new main to reconnecting with the existing fire service <br /> line, including yet not limited to, tee, reducers; pipe installation; restrained joint fittings;trench <br /> excavation, backfill and compaction; clearing and grubbing; testing; connection to existing <br /> service line including couplings, pipe, and fittings needed to connect the new pipe to existing I <br /> service; dewatering; and removal or abandonment of existing service connection. <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> Sewer 0 Division B—BID DESCRIPTIONS April,2020 I <br /> WO No.—UP3691 SP-20 <br />