Laserfiche WebLink
I <br /> CITY OF EVERETT SPECIAL PROVISIONS [Modified per Addendum #1] <br /> Working Drawings: Drawings, shop drawings, plans, diagrams, or calculations, <br /> including a schedule of submittal dates for Working Drawings where specified, which <br /> the Contractor must submit to the Engineer. (This definition replaces the definition in <br /> WSDOT 1-01.3 for Working Drawings.) <br /> ' Supplement Section 1-01.3 by adding the following: <br /> All references in the Standard Specifications to the terms "State", "Department of <br /> Transportation", "Washington State Transportation Commission", "Commission", <br /> "Secretary of Transportation", "Secretary", "Headquarters", and "State Treasurer" shall <br /> be revised to read "City." <br /> All references to the terms "State" or "state" shall be revised to read "City" unless the <br /> reference is to an administrative agency of the State of Washington, a State statute or <br /> regulation, or the context reasonably indicates otherwise. <br /> All references to "State Materials Laboratory" shall be revised to read "City designated <br /> location." <br /> Additive: A supplemental unit of work or group of bid items, identified separately in <br /> the Proposal, that may, at the discretion of the City, be awarded in addition to the base <br /> I Bid. <br /> Alternative or Alternate: One of two or more units of Work or groups of bid items, <br /> identified separately in the Proposal, from which the City may make a choice between <br /> different methods or material of construction for performing the same Work. <br /> Award Date: The date of the formal action by the Everett City Council to accept the <br /> lowest responsible and responsive Bidder for the Work. <br /> Baseline COVID-19 Requirements per Addendum 11: These include Governor <br /> Inslee's "Phase 1 Construction Restart COVID-19 Job Site Requirements", which <br /> is available at <br /> https://www.governor.wa.gov/sites/default/files/Phase%201%20Construction%20 <br /> COVID- <br /> 19%20Safety%20Requirements%20%28final%29.pdf?utm medium=email&utm s <br /> ource=govdelivery. Baseline COVID-19 Requirements also include all other <br /> COVID-19 Requirements applicable to construction similar to the Work as of the <br /> date of Bid opening. <br /> Bid Opening Date: The date the Everett City Clerk publicly opens and reads the Bids. <br /> Business Day: A business day is any day from Monday through Friday except <br /> holidays as listed in 1-08.5. <br /> Change Order: Reference to Change Order shall include all rights of the City and <br /> Contractor under 1-04.4 CHANGES. Agreed Change Orders shall be in the form <br /> attached as Appendix C. Unilateral Change Orders shall be in the form attached as <br /> Appendix C. <br /> Contract Claim: Any request by the Contractor for additional time or money resulting <br /> in adjustment of Contract Sum or Contract Time irrespective of the cause or reason for <br /> the request. Contract Claims include, but are not limited to, requests by the Contractor <br /> for additional time or money due to Extra Work, inefficiencies, Delays, interferences, <br /> and problems with the design. Contract Claim includes, but is not limited to, claims or <br /> requests by Subcontractors for extensions of Contract Time, adjustment of Contract <br /> Sum, additional compensation that the Contractor attempts to pass through or assert <br /> against the City, or claims against the City arising out of a third party's claim against <br /> the Contractor. <br /> Contract Documents: See definition for"Contract." <br /> Sewer 0 Division 1 —GENERAL REQUIREMENTS Addendum No. 1 <br /> WO No—UP3691 SP—47 May 2020 <br />