I <br /> CITY OF EVERETT SPECIAL PROVISIONS [Modified per Addendum #1] <br /> [Revised per Addendum 1]: <br /> Contract Execution DateThe date the Mayor of the City of <br /> Everett signs the Contract or the date that the Contractor signs the Contract, <br /> whichever date is later. This officially binds the Contractor to the Contract. <br /> Contract Sum: The price in dollars stated in the Contract to be paid by the City to the <br /> Contractor for the Work described in the Contract Documents, as modified by Change <br /> Orders. <br /> Contract Time: The period of time established by the terms and conditions of the <br /> Contract within which the Work must be physically completed. <br /> COVID-191Added per Addendum 1]: Disease related to the novel coronavirus (SARS-CoV- <br /> 2), which is the subject of the Governor' Inslee's proclamation dated February <br /> 29, 2020, and subsequent proclamations. <br /> COVID-19 Requirements[Added per Addendum 1]: All governmental laws, regulations, <br /> requirements, and orders relating to COVID-19, including without limitation <br /> OSHA, L&I or other safety rules relating to COVID-19 and COVID-19 <br /> gubernatorial proclamations and orders.. <br /> Delay: Any increase in the duration of the critical path of the Project. <br /> Dispute: Any controversy or disagreement. <br /> Equipment: Mechanical, electrical, instrumentation, or other devices with one or more <br /> moving parts, or devices requiring an electrical, pneumatic, electronic, or hydraulic <br /> connection. <br /> Extended Overhead: The increase in Overhead costs attributable to an extension of <br /> Contract Time. <br /> Extra Work: Providing materials and Equipment and the performance of Work not <br /> directly called for in, or implied by, the Contract Documents, such that Contractor <br /> would be entitled to an adjustment of Contract Sum and possibly an extension of <br /> Contract Time. <br /> Final Acceptance: Formal action by Everett City Council determining that all of the <br /> Contractor's Work has been completed, except for any landscaping maintenance. <br /> Float: The amount of time between the early start date and the late start date, or the <br /> early finish date and the late finish date of an activity in the Project schedule. <br /> Force Account: Costs of performing Work as defined in 1-09.6 FORCE ACCOUNT. <br /> Furnish: To deliver items, Equipment, or material to the job site or other specified I <br /> location. <br /> Install: Placing, erecting, or constructing complete in place items, Equipment, or <br /> material. <br /> May: Conduct that is permitted, but not required. <br /> Notice: A signed, written communication by the Contractor to the City as described in <br /> 1-04.5 NOTICE BY CONTRACTOR of these Special Provisions. <br /> Notice of Award: The written notice from the City of Everett to the successful Bidder <br /> signifying the City's acceptance of the Bid. No Contract is formed until the Contract <br /> Execution Date[Added per Addendum 1]. <br /> Notice to Proceed: The written Notice from the City or City's Representative to the <br /> Contractor authorizing and directing the Contractor to proceed with the Work and <br /> establishing the date on which the Contract Time begins. Multiple and partial Notices <br /> to Proceed may be issued on a single Project. <br /> Over absorbed Overhead: Over recovery of fixed indirect costs that occurs when a <br /> Contractor performs more overall Work than it otherwise would have performed. <br /> Sewer 0 Division 1 —GENERAL REQUIREMENTS Addendum No. 1 <br /> WO No—UP3691 SP—48 May 2020 <br />