My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 7/22/2020
>
Contracts
>
Capital Contract
>
Interwest Construction Inc. 7/22/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2021 11:31:35 AM
Creation date
7/29/2020 8:59:51 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
7/22/2020
Council Approval Date
6/7/2020
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Sewer "O" Utility Upgrades
Public Works WO Number
UP3691
Tracking Number
0002362
Total Compensation
$4,234,567.89
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 6/21/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 6/23/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
688
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS I <br /> The Contractor shall provide a separate payment bond and performance bond, each in <br /> the amount of 100 percent of the Contract Sum and each in the form contained in the I <br /> Contract Documents. These bonds shall serve as security for the faithful performance <br /> of the Work and as security for the faithful payment and satisfaction of the persons <br /> furnishing materials and performing labor on the Work. The bonds shall be issued by a I <br /> corporation duly and legally licensed to transact surety business in the State of <br /> Washington. Such bonds shall remain in force throughout the period required to <br /> complete the Work, and thereafter for a period of 365 calendar days after Final <br /> Acceptance. The bonds must be executed by a duly licensed surety company, which <br /> is listed in the latest Circular 570 of the United States Treasury Department, as being <br /> acceptable as surety on federal bonds. No surety's liability on the bond shall exceed <br /> the underwriting limitations for the respective surety specified in Circular 570. The I <br /> bonds must be signed by an officer of the Contractor empowered to sign binding <br /> instruments. The bonds must be accompanied by a fully executed and original power <br /> of attorney for the officer executing on behalf of the surety. The scope of the bonds or <br /> the form thereof prescribed in these Contract Documents shall in no way affect or alter <br /> the liabilities of the Contractor to the Owner as set forth in the Contract Documents. <br /> 1-03.5 Failure to Execute Contract <br /> Supplement 1-03.5 by adding the following: <br /> In addition to the items listed in the first paragraph of 1-03.5, failure to have or obtain a <br /> City of Everett business license prior to executing the Contract, unless immediately I <br /> cured by Bidder after notice from the City, shall result in forfeiture of the proposal bond <br /> or deposit of this Bidder. <br /> 1-03.6 Return of Bid Deposit I <br /> Supplement 1-03.6 by adding the following: <br /> Within 15 calendar days after the Bids are opened, the City will return the bid deposit <br /> accompanying the Bids that are not to be considered in making the Award. I <br /> 1-03.7 Judicial Review <br /> Revise the first paragraph of 1-03.7 to read as follows: <br /> All protests by Bidders must be in accordance with Chapter 3.46 of the Everett I <br /> Municipal Code, "Bid Protest Procedures." <br /> The exclusive venue of all lawsuits shall be in Snohomish County Superior Court. <br /> 1-04 SCOPE OF THE WORK I <br /> 1-04.1 Intent of the Contract <br /> Supplement 1-04.1 by adding the following: I <br /> 1-04.1(3) Specifications and Plans <br /> (******) <br /> 1-04.1(3)A Interpretation of Specifications and Plans I <br /> The Specifications and Plans are intended to be explanatory and supportive of <br /> each other. Work specified on the Plans and not in the Specifications, or vice <br /> versa, shall be executed as if specified in both. In the event the Work to be done I <br /> or matters relative thereto are not sufficiently detailed or explained in the Contract <br /> Documents, the Contractor shall immediately ask the City's Representative for <br /> further explanation and shall comply with such explanation. In the event of doubt I <br /> or question arising respecting the true meaning of the Specifications or Plans, <br /> Contractor shall refer to the City's Representative for its decision. <br /> Sewer 0 Division 1-GENERAL REQUIREMENTS April,2020 I <br /> WO No-UP3691 SP-58 <br />
The URL can be used to link to this page
Your browser does not support the video tag.