Laserfiche WebLink
I <br /> ICITY OF EVERETT SPECIAL PROVISIONS <br /> used in the preparation of the Proposal, requesting relief from the responsibilities of <br /> I Award. <br /> The affidavit shall describe the specific error(s) and certify that the work sheets are the <br /> originals used in the preparation of the Proposal. The Engineer will review the certified <br /> I work sheets to determine the validity of the claimed error and make recommendation <br /> to the City. If the City concurs in the claim of error, the Bidder will be relieved of <br /> responsibility, and the bid deposit of the Bidder will be returned. Thereafter, at the <br /> discretion of the City, all Bids may be rejected or Award made to next lowest and <br /> Iresponsive Bidder. <br /> 1-03.1(1) Identical Bid Totals <br /> I Delete 1-03.1(1) in its entirety and substitute the following: <br /> 1-03.1(1) Preference for Resident Contractors <br /> (******) <br /> I In accordance with RCW 39.04.380, if a Bid is received from a nonresident contractor <br /> from a state that provides a percentage bidding preference and does not have an <br /> office located in Washington, then a comparable percentage disadvantage will be <br /> applied to the Bid of that nonresident contractor. <br /> I1-03.2 Award of Contract <br /> Revise 1-03.2 to read as follows: <br /> I Within 45 days after the opening of Bids, the City will act either to accept the Bid from <br /> the lowest responsive, responsible Bidder, or to reject all Bids. The City reserves the <br /> right to request extensions of such Bid acceptance period. If the lowest responsible <br /> I Bidder and the City cannot agree on an extension by the 45 day deadline, the City <br /> reserves the right to award the Contract to the next lowest responsible Bidder or reject <br /> all Bids. <br /> I <br /> The acceptance of a Bid will be evidenced by a written Notice of Award of Contract <br /> delivered in person or by certified mail to the Bidder whose Bid is accepted, together <br /> with a request to furnish a Contract Bond and evidence of insurance and to execute <br /> the Contract set forth in the Contract Documents. <br /> I1-03.3 Execution of Contract <br /> Revise the first paragraph of 1-03.3 to read as follows: <br /> I Successful Bidder has 14 calendar days after receiving the Notice of Award to submit <br /> the following documents to the City: <br /> • Two executed copies of the Contract. <br /> I • Two original payment bonds and two original performance bonds submitted on <br /> forms contained in Contract Documents. <br /> • Certificate of Insurance and additional insured endorsement in accordance with <br /> 1-07.18 "Insurance"of the Special Provisions. <br /> IRevise the third paragraph of 1-03.3 to read as follows: <br /> If the Bidder experiences circumstances beyond their control that prevents return of <br /> the Contract Documents within 14-calendar days after the Award Date, the City may <br /> Igrant more time for return of the documents, provided the City deems the <br /> circumstances warrant it. <br /> Supplement 1-03.3 by adding the following: <br /> ' <br /> A Contract shall not be formed until the Contract Documents are signed by the Mayor. <br /> 1-03.4 Contract Bond <br /> I Revise 1-03.4 to read as follows: <br /> Sewer O Division 1 —GENERAL REQUIREMENTS April,2020 <br /> WO No—UP3691 SP—57 <br />