Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS [Modified per Addendum #1] <br /> c. Receipt of Addenda is not acknowledged; <br /> d. A member of a joint venture or partnership and the joint venture or partnership <br /> submit Proposals for the same project (in such an instance, both Bids may be 111 <br /> rejected); or <br /> e. If Proposal form entries are not made in ink. <br /> 1-02.14 Disqualification of Bidders <br /> Revise 1-02.14 to read as follows: <br /> A Bidder will be deemed not responsible if the Bidder does not meet the mandatory <br /> bidder responsibility criteria in RCW 39.04.350(1), as amended, and noted in 1- <br /> 02.1(1). <br /> The City will verify that the Bidder meets the mandatory bidder responsibility criteria in <br /> RCW 39.04.350(1). To assess bidder responsibility, the City reserves the right to <br /> request documentation as needed from the Bidder and third parties concerning the <br /> Bidder's compliance with the mandatory bidder responsibility criteria. ' <br /> If the City determines the Bidder does not meet the mandatory bidder responsibility <br /> criteria in RCW 39.04.350(1) and is therefore not a responsible Bidder, the City shall <br /> notify the Bidder in writing, with the reasons for its determination. If the Bidder <br /> disagrees with this determination, it may appeal the determination within two business <br /> days of the City's determination by presenting its appeal and any additional information <br /> to the City. The City will consider the appeal and any additional information before <br /> issuing its final determination. If the final determination affirms that the Bidder is not <br /> responsible, the City will not execute a contract with any other Bidder until at least two <br /> business days after the Bidder determined to be not responsible has received the <br /> City's final determination <br /> 1-02.15 Pre-Award Information <br /> Revise 1-02.15 to read as follows: ' <br /> Before awarding any contract, the City may require one or more of these items or <br /> actions of the apparent lowest responsible Bidder: <br /> 1. A complete statement of the origin, composition, and manufacture of any or <br /> all materials to be used, <br /> 2. Samples of these materials for quality and fitness tests, <br /> 3. A progress schedule, in a form the City requires, showing the order of and <br /> time required for the various phases of the Work, <br /> 4. A breakdown of costs assigned to any bid item, <br /> 5. Attendance at a conference with the Engineer or representatives of the <br /> Engineer, <br /> 6. Obtain, and furnish a copy of, a business license to do business in the City of <br /> Everett. <br /> 7. A copy of State of Washington Contractor's Registration, or <br /> 8. Any other information or action taken that is deemed necessary to ensure that ' <br /> the Bidder is the lowest responsible bidder. <br /> 1-03 AWARD AND EXECUTION OF CONTRACT 111 <br /> 1-03.1 Consideration of Bids <br /> Revise the first paragraph to read: <br /> After opening and reading Proposals, the City will check them for correctness of <br /> extensions of the prices per unit and the total price. If a discrepancy exists between <br /> Sewer 0 Division 1 —GENERAL REQUIREMENTS Addendum No. 1 <br /> WO No—UP3691 SP—56 May 2020 <br />